Good day fellow legians.... i went to the sales galery last saturday....and made a non-refundable booking of 5k on sunday for an end unit tagged at 775k.... finger cross loan is ok else my deposit is burnt.... but today after browsing through the paper i've signed.... a shock is one of the paper that read Acceptance of Condition.... but i have yet to get a chance to check for the house condition ..eg. water leaks, cracks etc... does this mean i've no right to lodge a complain after this...? this is my first home and humbly seek for advice.... many thanks thomas
This post has been edited by thomas_dotcom: Apr 8 2014, 06:32 PM
|
|
|
|
|
|
thomas_dotcom
|
Apr 8 2014, 08:48 PM
|
Getting Started

|
QUOTE(felixcfk @ Apr 8 2014, 07:38 PM) 775k for end lot with extra 5 feet land? this end lot i reckon is 8feet wider..and the back is 5 feet longer.... This post has been edited by thomas_dotcom: Apr 8 2014, 08:49 PM
|
|
|
|
|
|
thomas_dotcom
|
Apr 8 2014, 08:52 PM
|
Getting Started

|
QUOTE(csong60 @ Apr 8 2014, 08:12 PM) Were the keys handed to you AFTER signing the Acceptance of Condition document? If not then I think you still have a right to lodge a complain. You can always argue that since you are not holding the keys, whatever damages is out of your control. Just my thought .... hopefully no problem with the house condition. nope....no keys is dealt throughout the procedure.... i think i get what you mean.... but im just curious if owner is signing the same document after every complain is rectified. If yes....i think im in a hot soup....
|
|
|
|
|
|
thomas_dotcom
|
Apr 9 2014, 08:44 AM
|
Getting Started

|
QUOTE(joeec @ Apr 9 2014, 07:25 AM) Let them know that you've not made the inspection and it should be fine, since u've not gotten your keys. After you get your keys and made the inspection, I think there's another form to sign. Remember to check thoroughly especially water leaking and hollow tiles (toilet walls in my case) as these two seem to be the common defects encountered. Many many thanks.... Was so worried about this..... and thanks for sharing with the your defects....will pay more attention on these Thomas
|
|
|
|
|
|
thomas_dotcom
|
Apr 9 2014, 11:15 AM
|
Getting Started

|
QUOTE(KYspeaks @ Apr 9 2014, 10:16 AM) Also best to check the house right after a heavy downpour for any signs of leak. very true....finger cross that the loan can go through at this moment.... and as i read through this thread....it does mentioned that the developer still accept and cover defect up to 24 months....is that correct...??
|
|
|
|
|
|
thomas_dotcom
|
Apr 9 2014, 11:17 AM
|
Getting Started

|
QUOTE(noproblem @ Apr 9 2014, 10:55 AM) End lot is 5 feet wider.  Welcome to neighborhood. hm.... i think i got myself confused edi.... mine is intermediate end lot....so its end lot right...not corner hor??? And thank you....buit still waiting for the loan approval.... sort of mixed feeling...
|
|
|
|
|
|
thomas_dotcom
|
Apr 9 2014, 12:38 PM
|
Getting Started

|
QUOTE(thomas_dotcom @ Apr 8 2014, 06:32 PM) Good day fellow legians.... i went to the sales galery last saturday....and made a non-refundable booking of 5k on sunday for an end unit tagged at 775k.... finger cross loan is ok else my deposit is burnt.... but today after browsing through the paper i've signed.... a shock is one of the paper that read Acceptance of Condition.... but i have yet to get a chance to check for the house condition ..eg. water leaks, cracks etc... does this mean i've no right to lodge a complain after this...? this is my first home and humbly seek for advice.... many thanks thomas
Wow...wow...wow.....!!! someone from the developer is actually looking at this thread..... the rep from developer just called up and explained to me that there will be another few rounds of inspection after this.....ok....so its me that worried too much.... Good job to the team....... ok...next thing to pray for..... loan approval...!!
|
|
|
|
|
|
thomas_dotcom
|
Apr 10 2014, 02:49 PM
|
Getting Started

|
QUOTE(waiwai79 @ Apr 9 2014, 11:08 PM) 775k.... Wow.. so expensive.. Any discount form developer? as usual.....10% downpayment borne by developer... so pay booking fees 5k.....loan everything done....then i'll be able to move into my dream home...!!!! This post has been edited by thomas_dotcom: Apr 10 2014, 04:19 PM
|
|
|
|
|
|
thomas_dotcom
|
Apr 11 2014, 11:42 PM
|
Getting Started

|
QUOTE(yoong81 @ Apr 11 2014, 02:13 PM) 775K is very expensive for an end lot, even after 10% discount... any rebate for MOT? The developer covers legals, SnP.... duty stamp...yes..I think they mentioned MOT. ..
|
|
|
|
|
|
thomas_dotcom
|
Apr 11 2014, 11:44 PM
|
Getting Started

|
QUOTE(KYspeaks @ Apr 11 2014, 02:51 PM) Actually is end lot 22x65 or 20x65? If it's the former it's actually quite worth it I think. Extra 5 feet is one thing but extra windows on the side is very useful. The build up is 20x65 ..... Indeed an extra sliding door n windows makes a lot difference..... And btw... is this township with CF already...?
|
|
|
|
|
|
thomas_dotcom
|
Apr 12 2014, 09:25 AM
|
Getting Started

|
QUOTE(woody33 @ Apr 12 2014, 01:50 AM) means 28x65 fully built up or land? Land size is 30x70
|
|
|
|
|
|
thomas_dotcom
|
Apr 14 2014, 08:16 AM
|
Getting Started

|
QUOTE(felixcfk @ Apr 12 2014, 05:10 PM) i thought developer unit was sold out? still available now ? Leftoever units, only 2 end lots....and another one facing the back of a factory.
|
|
|
|
|
|
thomas_dotcom
|
Apr 14 2014, 04:32 PM
|
Getting Started

|
QUOTE(yoong81 @ Apr 14 2014, 02:37 PM) hmm... abit confused here... u say the build up is 20x65. then got 5 feet additional land at the side. then the land size shud be 25x65 rite? how can it be 30x70? tat is very big.. u can make outdoor bbq  bahaha.... my sincere apology.... was dreaming all these while looking at the intermediate unit's lay out here you go....
|
|
|
|
|
|
thomas_dotcom
|
Apr 15 2014, 09:59 AM
|
Getting Started

|
QUOTE(Vampyr3 @ Apr 15 2014, 08:47 AM) Nice! Is this at Legian? Didn't know the corner units were 30x70 until now. Is your house at the last row or side row? Yes, Legian. Enter the guard house turn to the left, and the last row where the back of this unit is actually back to back of Rimba shoplots separated with a brick wall. I think this unit is abandon due to its nature of house facing to the junction. But me and my family agrees that the junction doesn't align to the main gate or the sliding door. The fact is, both the greens at the side and back of the house is teeeeempting...!!
|
|
|
|
|
|
thomas_dotcom
|
Apr 15 2014, 02:35 PM
|
Getting Started

|
QUOTE(felixcfk @ Apr 15 2014, 02:11 PM) Is that means facing east side? Yes.... and Felix... you staying around...?
|
|
|
|
|
|
thomas_dotcom
|
Jun 3 2014, 06:56 PM
|
Getting Started

|
QUOTE(popice2u @ Jun 3 2014, 06:01 PM) aiyo anyone can share what is the alternative brand for the floor tiles (same color) since white horse no longer manufacture it. Are you referring to the tiles in the living room....??
|
|
|
|
|
|
thomas_dotcom
|
Jul 7 2014, 12:51 PM
|
Getting Started

|
QUOTE(wookp @ Jul 7 2014, 11:47 AM) Hmmm... Well yeah, I can't seem to find what the third ones does. I have installed all my lights and it seems that 1 of the three switches does absolutely nothing. Any intermediate owners that knows? If im not wrong, there is two optional/hidden point inside the plaster ceiling undert the toilets. If you climb up to the plaster ceiling, look towards the staircase, u will find these 2 terminals. Was being told by Ken Rimba Contractor during joint inspection. And i reckon this is the same for both intermediate and End Lot. Happy hunting.....
|
|
|
|
|
|
thomas_dotcom
|
Jul 7 2014, 12:55 PM
|
Getting Started

|
QUOTE(redlyfs @ Jul 5 2014, 02:43 PM) Actually they only provide workmanship. I bought the sand and tiles, if still interested I'll try find the contact/address for the material sellers and the workers. Workmanship RM350 , materials approx RM150 Hi Red, did they lay any concrete or enforcement steel wire underneath...?
|
|
|
|
|
|
thomas_dotcom
|
Jul 7 2014, 12:59 PM
|
Getting Started

|
QUOTE(EnjiLai @ Jun 29 2014, 11:46 PM) The properties in phase 1 were completed earlier than schedule. Notices were sent to inform us that delivery of vacant possession was end July 2012. With expiry of the defect liability period of 24 months; start August 2014, each homeowner now have to bear the monthly service charges. Not sure about purchasers who bought sub sale from ken at a later date than us. Better check your mail from them or check with GNSB for clearer details.  Aiyoooo.... my defect list is like 8 full page of A4 leh...and includes everything from the above mentioned... sad case is im not in KL to follow up..... warranty expiring coming August....means nothing will be cover thereafter......???
|
|
|
|
|
|
thomas_dotcom
|
Jul 7 2014, 04:17 PM
|
Getting Started

|
QUOTE(redlyfs @ Jul 7 2014, 02:15 PM) The hole is not deep. I dug it in hopes I might actually plant a small bush but the soil is only 1 feet deep or less before hitting concrete. I just dumped sand and did a cement layer before tiling. Hopefully there's no issues in future Ahhh.... thanks alot for the information. Thomas
|
|
|
|
|