 TM HSBB Expansion To Slowdown & Halt, After Phase 1 (Ended Dec 2012)

views
     
TSAhn3hn3h
post Mar 20 2013, 07:44 PM

Getting Started
**
Junior Member
82 posts

Joined: Aug 2011
From: Kg. Buah Pala



QUOTE(blacktubi @ Mar 20 2013, 06:29 PM)
laugh.gif The pole is TM, it doesn't come with a lamp, it doesn't come with TNB marking, it is owned by TM, the copper distribution point are there, come with TM spray paint and their code.  laugh.gif

My area got 2 pole, one at front and one at back.  smile.gif

Anyway, half of the housing area is wired with fibre, fibre distribution point is already installed  smile.gif

Just halted
*
I do not know the answer to your earlier question but you mentioned earlier in post #14 about fibre cables behind lamp posts, that's where I got the idea it was on lamp poles, maybe I misunderstood.

Actually you can try to get a better answer from a TM technician assigned to your areas telephone exchange.

But the chance of your area getting Unifi covered is high since you say your housing area some parts already got Unifi. TM will eventually cover the blind spots if the exchange covering your area is already serving Unifi.

What I was trying to say earlier is those exchanges earlier not serving Unifi service, chances of getting it will be slim for expansion.

 