Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Any good and reliable interior designer?

views
     
ehwee
post Jul 23 2018, 07:35 PM

Value Our Living Spaces!
*****
Junior Member
790 posts

Joined: Sep 2013
From: Selangor


Take a look at GetIDonline, we provide trusted and affordable interior design remotely
ehwee
post Jul 25 2018, 04:53 PM

Value Our Living Spaces!
*****
Junior Member
790 posts

Joined: Sep 2013
From: Selangor


QUOTE(yllew03 @ Jul 25 2018, 11:49 AM)
Yes, that is my understanding as well, but it is not.
The phrase is stated in the design fee quotation.
Deposit has been paid before design/3D drawing.
After 3D drawing, I appointed him as main contractor.
At the final stage of reno, he said the deposit is not refundable. He said “The refund of the design fee will only be eligible if we were appointed as main contractor for all scopes from A-Z including furniture purchase, curtain, bed frame etc. Only sofa and bed I use back my existing one, fan I purchased, curtain I engage curtain maker before the project and already inform him during the 1st meeting, and he accepted but verbal only.
So I am wondering is this common in the Interior Design and Build world.
*
Did your main contractor has b&w written quotation stated with t&c " The refund of the design fee will only be eligible if we were appointed as main contractor for all scopes " as he said to you.

if no b&w, it will be hard for you to argue with him.

This post has been edited by ehwee: Jul 25 2018, 04:53 PM
ehwee
post Jul 25 2018, 07:22 PM

Value Our Living Spaces!
*****
Junior Member
790 posts

Joined: Sep 2013
From: Selangor


QUOTE(yllew03 @ Jul 25 2018, 06:58 PM)
Only below is written in the quotation t&c.
“Refundable if we are appointed as the main contractor for all construction scopes only and will be refunded only after the renovation deposit is received”

Never mentioned all construction scopes means A-Z include furniture, curtain and so on. All the structural works, flooring, ceiling, painting, glass&aluminium, m&e, aircon and carpentry for the whole unit was done by him, although I know some of the items he charge much higher than market, plus paying project management fee, yet still considered not all scope, so speechless and no point arguing, I will pay anyhow. Learn a lesson.
*
That's the definition of " all construction scopes " makes the argument then.

Most design and build firms will separate design fee and the construction quotation, they will ask for upfront fee for design drawings

Whether they will return these design fee for client is depend on their company policy, some of them will return or deduct the design fee from the total construction cost when you decide to appoint them for construction as per their quotation.

Some of company will not deduct the design fee even if you appoint them for construction works later part.

Yet your main contractor ask for deposit, is this deposit is part of the construction cost or as a design fee?

This you will need to clarify with him upfront before they actually start the design process.

This post has been edited by ehwee: Jul 25 2018, 07:23 PM
ehwee
post Aug 7 2018, 08:13 AM

Value Our Living Spaces!
*****
Junior Member
790 posts

Joined: Sep 2013
From: Selangor


Yes, different ID charge with different payment terms.

You can approach a design and build firms to provide you the home design drawings. normally they will request for up front deposit for their design proposal.

Some of them will return the deposit to you if awarding them on construction works after you see their design.

Yet if you decide not to let them do construction may be due to their expensive renovation quotation, you won't get back the early deposit mostly.

the deposit request early by these ID firms is actually for them to pay for their in house designer salary or their regular freelance designers to produce the design proposal. Without being awarded for construction works base on their submit renovation quotation, there is no way for them to return the deposit and provide free ID drawings for public

This post has been edited by ehwee: Aug 7 2018, 08:15 AM

 

Change to:
| Lo-Fi Version
0.0209sec    0.48    7 queries    GZIP Disabled
Time is now: 14th December 2025 - 05:46 AM