Investment Elements@Ampang, Good
|
76radius
|
Jul 24 2012, 12:23 AM
|
Getting Started

|
QUOTE(AMINT @ Jul 14 2012, 09:03 PM) From that advertisement, there will be seminar by MRT rep. So i believe proposed MRT is now "confirmed" MRT. good news The construction stage quite slow for Elements. Now only up to Stage 2a. The next billing will be in September.
|
|
|
|
|
|
76radius
|
Jul 24 2012, 12:26 AM
|
Getting Started

|
QUOTE(kh8668 @ Jul 24 2012, 12:24 AM) what is the sale rates now? Not sure. Have to check with the Developer. I managed to get 825 sq ft. They have few panel lawyers.
|
|
|
|
|
|
76radius
|
Sep 5 2012, 08:39 PM
|
Getting Started

|
QUOTE(AMINT @ Jul 24 2012, 05:29 AM) 4 days ago: http://imageshack.us/photo/my-images/267/picture106o.jpg/if you compare from earlier picture, it is about 3-4 storeys higher. Hopefully not so fast. wait for mcity.huhu Cool. Thanks for the updates.
|
|
|
|
|
|
76radius
|
Dec 8 2012, 09:54 PM
|
Getting Started

|
QUOTE(AMINT @ Dec 8 2012, 07:36 PM) got studio around rm400k++. got 1 bedroom around rm560k++. got 2 bedrooms around rm700k++. got 3 bedrooms around rm900k++ Added on December 8, 2012, 7:41 pmeverywhere started slowing down since bnm introduced 3rd property LTV70%. Only a few landed props i bought sold out during launching day Got units facing KLCC opened up for sale. Last time I went there all are fully booked, perhaps loans not approved by the Banks. BTW, the construction stage now reached stage 2b. Just received the billings last week.
|
|
|
|
|
|
76radius
|
Dec 12 2012, 07:17 AM
|
Getting Started

|
QUOTE(nie feng @ Dec 12 2012, 06:31 AM) Sorry I'm not in the country right now so bank can not call.. Is it true already 2 months default ? Anybody else can give feedback? Also what is the progress? Crane ada jalan ka The construction stage has reached the 11 floor. I have received the billing for Stage 2b, end of last month.
|
|
|
|
|
|
76radius
|
Dec 12 2012, 09:55 PM
|
Getting Started

|
QUOTE(froglai88 @ Dec 12 2012, 06:22 PM) Oledi reached 11th flr, progress well, thx for d update. When is d expecting completion date, 2014 or 2015 ? Expected to complete by 2014. Most prob year end.
|
|
|
|
|
|
76radius
|
Dec 16 2012, 09:11 AM
|
Getting Started

|
QUOTE(AMINT @ Dec 16 2012, 08:50 AM) i went to elements 2 days ago and asked GCB pak guard to let me in. just to let u know that those 1st phase units facing ampang hill has a good view of GCB swimming pool. so nice. GCB swimming pool is well maintained as well Mine facing Ampang at 11 floor. Hopefully not facing the Flamingo hotel.
|
|
|
|
|
|
76radius
|
Dec 16 2012, 09:26 AM
|
Getting Started

|
QUOTE(AMINT @ Dec 16 2012, 09:23 AM) if urs is 1st phase (1st block), then u will have a good view of the pool. i bought low unit too coz i wanna rent it out cheaper than everybody else can Yes, mine is the 1st Phase. That's cool. hehe
|
|
|
|
|
|
76radius
|
Dec 16 2012, 09:40 AM
|
Getting Started

|
QUOTE(AMINT @ Dec 16 2012, 09:28 AM) i will post some pics when i get to my laptop. lowyat should allow to post via iphone. sure laju wan Thanks Bro. Will wait for that.
|
|
|
|
|
|
76radius
|
Dec 18 2012, 10:12 PM
|
Getting Started

|
QUOTE(AMINT @ Dec 17 2012, 05:00 PM) Grill Chicken Burger at McD. huhh. jokes aside, the condo next to elements Added on December 18, 2012, 8:01 amDear All, Sorry for late posting. here are some new pics. Picture 1: Side view of Block A and B  Uploaded with ImageShack.usPicture 2: GCB Court swimming pool that low units of Block B and A will be facing (facing ampang hill)  Uploaded with ImageShack.usPicture 3: More side view  Uploaded with ImageShack.usPicture 4: Front view  Uploaded with ImageShack.usThanks Bro. Seems construction stage on time.
|
|
|
|
|
|
76radius
|
Dec 18 2012, 10:23 PM
|
Getting Started

|
QUOTE(AMINT @ Dec 18 2012, 10:16 PM) yup. but why m-city is still a big hole? someone here said m-city already at ground level but i checked still big hole. hopefully both will complete around the same time Mah Sing has launched Tower 1 & 2, Tower 3 will be launched early next year. They will start with the foundation after launching of Tower 3.
|
|
|
|
|
|
76radius
|
Jan 13 2013, 09:58 PM
|
Getting Started

|
QUOTE(froglai88 @ Dec 19 2012, 11:18 AM) Thx for the pic. I cant remember where is mine facing, hahaha. But eveif facing GCB, will b too high to look down at the pool..  The Elements seem has reached 15 floor. The billing has been issued.
|
|
|
|
|
|
76radius
|
Jan 14 2013, 07:10 AM
|
Getting Started

|
QUOTE(AMINT @ Jan 13 2013, 10:02 PM) how much is the billing and the % of completion based on the amount? Supposed to VP by 2014, right? 15% billing. Reached Stage 2b. yeah VP in 2014.
|
|
|
|
|
|
76radius
|
Jan 22 2013, 09:54 PM
|
Getting Started

|
QUOTE(a-ei-a @ Jan 22 2013, 09:45 PM) Guys, is ur SPA included the free items like kitchen cabinet? Yes. Including Hob & Hood, Built-in Oven, Wardrobe, Built-in Hot Water System for Bathroom Plus Air Conditioning Units under 4th Schedule of the SPA.
|
|
|
|
|
|
76radius
|
Jan 22 2013, 11:06 PM
|
Getting Started

|
QUOTE(a-ei-a @ Jan 22 2013, 10:42 PM) Is this suppose to be in as necessity or depends on solicitor?  SPA draft (softcopy) I received doens't state these. Which Unit Type?
|
|
|
|
|
|
76radius
|
Feb 3 2013, 09:55 AM
|
Getting Started

|
QUOTE(a-ei-a @ Jan 22 2013, 11:12 PM) They should include it in your agreement.
|
|
|
|
|
|
76radius
|
Mar 10 2013, 10:35 AM
|
Getting Started

|
QUOTE(a-ei-a @ Feb 23 2013, 01:19 AM) Yes, it's in the SPA. and, here is the site progress: » Click to show Spoiler - click again to hide... «
[attachmentid=3317382]
[attachmentid=3317383]
Pretty fast. I received another Billing for Stage 2D (electrical wiring, plumbing, roofing for the unit)
|
|
|
|
|
|
76radius
|
Apr 1 2013, 08:30 PM
|
Getting Started

|
QUOTE(AMINT @ Apr 1 2013, 03:22 PM) Yeah, i nego until no lock in period that time. Long time already. Anyway i got some new pics. Later i post. It's already 26th floor completed. Developer targeted to complete one floor every week. Expected delivery vacant possession by 2nd quarter of 2014 as confirmed by Developer.
|
|
|
|
|