Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

Investment Elements@Ampang, Good

views
     
76radius
post Jul 24 2012, 12:23 AM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(AMINT @ Jul 14 2012, 09:03 PM)
From that advertisement, there will be seminar by MRT rep. So i believe proposed MRT is now "confirmed" MRT. good news
*
The construction stage quite slow for Elements. Now only up to Stage 2a. The next billing will be in September.
76radius
post Jul 24 2012, 12:26 AM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(kh8668 @ Jul 24 2012, 12:24 AM)
what is the sale rates now?
*
Not sure. Have to check with the Developer. I managed to get 825 sq ft. They have few panel lawyers.
76radius
post Sep 5 2012, 08:39 PM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(AMINT @ Jul 24 2012, 05:29 AM)
4 days ago:

http://imageshack.us/photo/my-images/267/picture106o.jpg/

if you compare from earlier picture, it is about 3-4 storeys higher. Hopefully not so fast. wait for mcity.huhu
*
Cool. Thanks for the updates.
76radius
post Dec 8 2012, 09:54 PM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(AMINT @ Dec 8 2012, 07:36 PM)
got studio around rm400k++. got 1 bedroom around rm560k++. got 2 bedrooms around rm700k++. got 3 bedrooms around rm900k++


Added on December 8, 2012, 7:41 pm
everywhere started slowing down since bnm introduced 3rd property LTV70%. Only a few landed props i bought sold out during launching day
*
Got units facing KLCC opened up for sale. Last time I went there all are fully booked, perhaps loans not approved by the Banks.

BTW, the construction stage now reached stage 2b. Just received the billings last week.
76radius
post Dec 12 2012, 07:17 AM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(nie feng @ Dec 12 2012, 06:31 AM)
Sorry I'm not in the country right now so bank can not call.. Is it true already 2 months default ? Anybody else can give feedback? Also what is the progress? Crane ada jalan ka
*
The construction stage has reached the 11 floor. I have received the billing for Stage 2b, end of last month.
76radius
post Dec 12 2012, 09:55 PM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(froglai88 @ Dec 12 2012, 06:22 PM)
Oledi reached 11th flr, progress well, thx for d update.  rclxms.gif

When is d expecting completion date, 2014 or 2015 ?
*
Expected to complete by 2014. Most prob year end.
76radius
post Dec 16 2012, 09:11 AM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(AMINT @ Dec 16 2012, 08:50 AM)
i went to elements 2 days ago and asked GCB pak guard to let me in. just to let u know that those 1st phase units facing ampang hill has a good view of GCB swimming pool. so nice. GCB swimming pool is well maintained as well
*
Mine facing Ampang at 11 floor. Hopefully not facing the Flamingo hotel.
76radius
post Dec 16 2012, 09:26 AM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(AMINT @ Dec 16 2012, 09:23 AM)
if urs is 1st phase (1st block), then u will have a good view of the pool. i bought low unit too coz i wanna rent it out cheaper than everybody else can
*
Yes, mine is the 1st Phase. That's cool. hehe
76radius
post Dec 16 2012, 09:40 AM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(AMINT @ Dec 16 2012, 09:28 AM)
i will post some pics when i get to my laptop. lowyat
should allow to post via iphone. sure laju wan
*
Thanks Bro. Will wait for that.
76radius
post Dec 18 2012, 10:12 PM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(AMINT @ Dec 17 2012, 05:00 PM)
Grill Chicken Burger at McD. huhh. jokes aside, the condo next to elements


Added on December 18, 2012, 8:01 amDear All,

Sorry for late posting. here are some new pics.

Picture 1: Side view of Block A and B

user posted image

Uploaded with ImageShack.us

Picture 2: GCB Court swimming pool that low units of Block B and A will be facing (facing ampang hill)

user posted image

Uploaded with ImageShack.us

Picture 3: More side view

user posted image

Uploaded with ImageShack.us
Picture 4: Front view

user posted image

Uploaded with ImageShack.us
*
Thanks Bro. Seems construction stage on time.

76radius
post Dec 18 2012, 10:23 PM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(AMINT @ Dec 18 2012, 10:16 PM)
yup. but why m-city is still a big hole? someone here said m-city already at ground level but i checked still big hole. hopefully both will complete around the same time
*
Mah Sing has launched Tower 1 & 2, Tower 3 will be launched early next year. They will start with the foundation after launching of Tower 3.
76radius
post Jan 13 2013, 09:58 PM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(froglai88 @ Dec 19 2012, 11:18 AM)
Thx for the pic.  I cant remember where is mine facing, hahaha.  But eveif facing GCB, will b too high to look down at the pool..  cry.gif
*
The Elements seem has reached 15 floor. The billing has been issued.
76radius
post Jan 14 2013, 07:10 AM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(AMINT @ Jan 13 2013, 10:02 PM)
how much is the billing and the % of completion based on the amount? Supposed to VP by 2014, right?
*
15% billing. Reached Stage 2b. yeah VP in 2014.
76radius
post Jan 22 2013, 09:54 PM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(a-ei-a @ Jan 22 2013, 09:45 PM)
Guys, is ur SPA included the free items like kitchen cabinet?
*
Yes. Including Hob & Hood, Built-in Oven, Wardrobe, Built-in Hot Water System for Bathroom Plus Air Conditioning Units under 4th Schedule of the SPA.
76radius
post Jan 22 2013, 11:06 PM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(a-ei-a @ Jan 22 2013, 10:42 PM)
Is this suppose to be in as necessity or depends on solicitor? hmm.gif
SPA draft (softcopy) I received doens't state these.
*
Which Unit Type?
76radius
post Feb 3 2013, 09:55 AM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(a-ei-a @ Jan 22 2013, 11:12 PM)
640 bro
*
They should include it in your agreement.
76radius
post Mar 10 2013, 10:35 AM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(a-ei-a @ Feb 23 2013, 01:19 AM)
Yes, it's in the SPA.  smile.gif
thumbup.gif  thumbup.gif  thumbup.gif
and, here is the site progress:  wink.gif

» Click to show Spoiler - click again to hide... «

*
Pretty fast. I received another Billing for Stage 2D (electrical wiring, plumbing, roofing for the unit)
76radius
post Apr 1 2013, 08:30 PM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(AMINT @ Apr 1 2013, 03:22 PM)
Yeah, i nego until no lock in period that time. Long time already. Anyway i got some new pics. Later i post.
*
It's already 26th floor completed. Developer targeted to complete one floor every week. Expected delivery vacant possession by 2nd quarter of 2014 as confirmed by Developer.
76radius
post May 25 2013, 09:01 PM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


The latest photos taken just now.

Attached Image Attached Image Attached Image

This post has been edited by 76radius: May 25 2013, 09:16 PM
76radius
post Feb 5 2014, 10:26 PM

Getting Started
**
Junior Member
232 posts

Joined: Jan 2006


QUOTE(nick6231 @ Feb 3 2014, 11:50 AM)
Went to The Elements site yesterday. Looks like it has completed all the way to the top. Any idea when the VP date is?
*
Heard it on 3rd quarter 2014. These are the latest photos.


Attached thumbnail(s)
Attached Image Attached Image Attached Image Attached Image Attached Image

2 Pages  1 2 >Top
 

Change to:
| Lo-Fi Version
0.0204sec    0.28    7 queries    GZIP Disabled
Time is now: 28th November 2025 - 06:46 PM