Outline ·
[ Standard ] ·
Linear+
PUCHONG V7, LRT lai liao Group
|
Kampung2005
|
Feb 19 2013, 11:48 PM
|
Proudly Kampungite, will always be one.
|
MPSJ has directed MRCB, the LRT contractor to improve drainage system. New drainage culvert might be done in 1 month and a half. According to MPSJ, LDP works might also be one of the factor behind the flooding. http://www.selangorku.com/?p=23154
|
|
|
|
|
|
Kampung2005
|
May 23 2013, 08:40 PM
|
Proudly Kampungite, will always be one.
|
Station 6,7 and 8 in Puchong will be like this (side platform)
|
|
|
|
|
|
Kampung2005
|
May 23 2013, 09:19 PM
|
Proudly Kampungite, will always be one.
|
QUOTE(stimix @ May 23 2013, 09:17 PM) Loyang Lu Maglev train stn in Shanghai copycat for sure  Ah, some say maglev, some say Dubai Metro etc. I hope this design will result into cooler interior in the station.
|
|
|
|
|
|
Kampung2005
|
Jun 18 2013, 04:12 PM
|
Proudly Kampungite, will always be one.
|
Proposed station names in Puchong (some of it) http://www.prasarana.com.my/news-events/me...komuter-stationQUOTE Seven stations at Awan Besar (Station 1), Muhibbah (Station 2), Kinrara BK5 (Station 4), IOI Puchong Jaya (Station 6), Pusat Bandar Puchong (Station 7), Taman Perindustrian Puchong (Station 8) and Putra Heights (Station 13) will be provided with park and ride facilities.
|
|
|
|
|