Welcome Guest ( Log In | Register )

5 Pages < 1 2 3 4 5 >Bottom

Outline · [ Standard ] · Linear+

> Ultimate Sg Buloh-Kajang MRT construction thread

views
     
jonc88
post Aug 14 2013, 04:49 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


KL Sentral

user posted image
https://fbcdn-sphotos-a-a.akamaihd.net/hpho...498603238_n.jpg

user posted image
https://fbcdn-sphotos-g-a.akamaihd.net/hpho...964621463_n.jpg

user posted image
https://fbcdn-sphotos-c-a.akamaihd.net/hpho...682679052_n.jpg
jonc88
post Aug 14 2013, 04:54 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Inai shaft

user posted image
https://fbcdn-sphotos-d-a.akamaihd.net/hpho...614470888_n.jpg

user posted image
https://fbcdn-sphotos-g-a.akamaihd.net/hpho...456484226_n.jpg

user posted image
https://fbcdn-sphotos-f-a.akamaihd.net/hpho...624378494_n.jpg

This post has been edited by jonc88: Aug 14 2013, 04:54 PM
jonc88
post Aug 14 2013, 05:08 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Semantan Portal

user posted image
https://fbcdn-sphotos-f-a.akamaihd.net/hpho...575045273_n.jpg

As at 26 July, Semantan 1 has bored 35m of the tunnel..
jonc88
post Aug 14 2013, 05:59 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(spacelion @ Aug 13 2013, 09:27 PM)
ya, i looked at the pictures and it\s roughly the same design
*
Yup.. I would expect so.. Have confirmation of your info.. smile.gif

user posted image

This post has been edited by jonc88: Aug 14 2013, 06:08 PM
jonc88
post Aug 16 2013, 03:54 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


user posted image
http://vault.starproperty.my.s3.amazonaws....07/mrt-line.jpg
jonc88
post Aug 19 2013, 10:11 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Maluri & cross-over cut and cover

user posted image
https://fbcdn-sphotos-h-a.akamaihd.net/hpho...023013333_n.jpg

user posted image
https://fbcdn-sphotos-b-a.akamaihd.net/hpho...382272730_n.jpg
jonc88
post Aug 20 2013, 04:20 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(don^don @ Aug 20 2013, 04:14 PM)
4 cab or 6 cab? should go for bombardier brows.gif
*
4-car.. Designed by BMW..
jonc88
post Aug 21 2013, 12:00 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(Hormonal Influences @ Aug 20 2013, 05:04 PM)
unlike singapore they require 6 cars because everyone there use the public transport (whole nation)
even they having 6 cars, they still got carry people, not merely bringing "angin" on board
*
Wasn't like that all the time though 6 cars were run from the start..
I think its easier to get more trains or lower the project cost in the short term by using 4-car trains.. However, the response to increase train length must be quick, unlike that of the Kelana Jaya Line in the past where they waited too long to react..
jonc88
post Aug 21 2013, 05:26 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Pasar Rakyat

user posted image
https://fbcdn-sphotos-c-a.akamaihd.net/hpho...687091014_n.jpg
jonc88
post Aug 21 2013, 06:21 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(Hormonal Influences @ Aug 21 2013, 12:09 AM)
yes if i'm not mistaken singapore started it's construction of the mrt line in 1985
by 1987 part of it were open and completed

they started with 6 cars and is still using 6 cars till today

what they did to improve their efficiency and cater for reducing people's travel time was to increase the frequency and time the trains accordingly to specific needs
*
1983 - construction began
1987 - 5 stations opened
1990 - completion of initial lines

What I meant was that the trains weren't always full from day 1.. They had periods, especially on the CCK Branch line where it was pretty empty (ala LRT)..

The frequency still has much to improve upon though..
jonc88
post Aug 22 2013, 10:45 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


KL Sentral

user posted image
https://fbcdn-sphotos-b-a.akamaihd.net/hpho...833657198_n.jpg
jonc88
post Aug 24 2013, 10:35 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Semantan Portal

user posted image
https://fbcdn-sphotos-f-a.akamaihd.net/hpho...112775305_n.jpg

Inside Tunnel

user posted image
https://fbcdn-sphotos-e-a.akamaihd.net/hpho...081910264_n.jpg

user posted image
https://fbcdn-sphotos-c-a.akamaihd.net/hpho...431357090_n.jpg
jonc88
post Aug 25 2013, 10:16 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(XtraSpicy @ Aug 25 2013, 10:09 PM)
Do you work for mrtc or mgkt planning department?
*
Haha, nope.. I just have them on Facebook.. They post about every day or so.. smile.gif
jonc88
post Aug 30 2013, 07:32 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Merdeka

user posted image
https://fbcdn-sphotos-e-a.akamaihd.net/hpho...915638956_n.jpg
jonc88
post Sep 10 2013, 10:32 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Sungai Buloh RRI

user posted image
https://fbcdn-sphotos-b-a.akamaihd.net/hpho...127529368_n.jpg

user posted image
https://fbcdn-sphotos-d-a.akamaihd.net/hpho...470538074_n.jpg

PBD

user posted image
https://fbcdn-sphotos-b-a.akamaihd.net/hpho...671514833_n.jpg

This post has been edited by jonc88: Sep 10 2013, 10:35 AM
jonc88
post Sep 10 2013, 12:23 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Construction and Completion of Elevated Stations and Other Associated Works at Sg Buloh, Kg Baru Sg Buloh and Kota Damansara (Package S1)

user posted image
http://www.trc.com.my/WebLITE/Applications...13/Picture1.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/Picture2.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/Picture3.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/Picture9.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/Picture4.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/Picture5.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/Picture6.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/Picture7.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/Picture8.jpg

Source: http://www.trc.com.my/html/product_details...%20&Repost=True

This post has been edited by jonc88: Sep 10 2013, 12:24 PM
jonc88
post Sep 10 2013, 12:27 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Package DPT1 : Construction and Completion of Sungai Buloh Maintenance Depot, Administration Building, External Works and Other Associated Works for Projek Mass Rapid Transit Lembah Kelang : Jajaran Sungai Buloh - Kajang

user posted image
http://www.trc.com.my/WebLITE/Applications...13/DSC_1288.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/DSC_1292.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/DSC_1293.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/DSC_1299.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/DSC_1307.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/DSC_1308.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/DSC_9471.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/DSC_9479.jpg

user posted image
http://www.trc.com.my/WebLITE/Applications...13/DSC_9493.jpg

Source: http://www.trc.com.my/html/product_details...%20&Repost=True
jonc88
post Sep 19 2013, 05:47 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Cochrane station

user posted image
https://fbcdn-sphotos-d-a.akamaihd.net/hpho...552268582_n.jpg

They are already casting the walls of the station at track level.. rclxms.gif

On another note, Cochrane 1 is about 500m away from Pasar Rakyat station..

This post has been edited by jonc88: Sep 19 2013, 06:13 PM
jonc88
post Sep 20 2013, 09:56 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Position of TBMs Semantan 1 and Semantan 2

user posted image
https://fbcdn-sphotos-f-a.akamaihd.net/hpho...590340596_n.jpg

QUOTE
Aerial view showing current position of TBM1 & TBM2.

TBM1 (@CH1+532.6) has mined 425m (304 rings), and has successfully passed through a slip road and low overburden zone at ch1+400.

TBM2 (@CH1+338) has mined 232m (166 rings) nad has passed through Lot 57; currently at road reserve.


-----------------------------------------------------------------------------------------------------------------------------------------

Position of Cochrane 1 and Cochrane 2, info on Cochrane 3 and Cochrane 4

user posted image
https://fbcdn-sphotos-a-a.akamaihd.net/hpho...975273363_n.jpg

QUOTE
Cochrane Tunnel:-

TBM1 @ R417 (592m): Under Kg Pandan Roundabout.
TBM2 @ R153 (222m): Under Ikano Boustead development site.
TBM3: Commissioning. Target to launch on 1 October 2013.
TBM4: Assembly currently ongoing.


This post has been edited by jonc88: Sep 20 2013, 10:00 AM
jonc88
post Sep 21 2013, 09:07 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


user posted image
https://fbcdn-sphotos-f-a.akamaihd.net/hpho...328867379_n.jpg

Overhead bridge in Cheras making way for the MRT viaduct..

Section 16 station

user posted image
https://fbcdn-sphotos-d-a.akamaihd.net/hpho...629545313_n.jpg

5 Pages < 1 2 3 4 5 >
Bump Topic Add ReplyOptions New Topic
 

Change to:
| Lo-Fi Version
0.0353sec    0.49    7 queries    GZIP Disabled
Time is now: 15th December 2025 - 02:32 PM