Need help translating if possible: s-774 กำลังจะเดินทาง s-776 อยู่ในขั้นตอนการประกอบ

user posted image
https://fbcdn-sphotos-g-a.akamaihd.net/hpho...308989186_n.jpg

So it appears that the next machine from Cochrane towards Pasar Rakyat is S-776.

user posted image
https://fbcdn-sphotos-c-a.akamaihd.net/hpho...212406738_n.jpg

Source: https://www.facebook.com/profile.php?id=100...location=stream
jonc88
post May 11 2013, 09:29 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


user posted image
https://fbcdn-sphotos-a-a.akamaihd.net/hpho...254992780_n.jpg

user posted image
https://fbcdn-sphotos-d-a.akamaihd.net/hpho...530979261_n.jpg

Source: https://www.facebook.com/profile.php?id=100000504246576
jonc88
post May 11 2013, 09:52 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Just spoke to someone involved in the project. There are 8 Herrenknecht machines and 2 more from another company (these are the Semantan ones).

3 machines are being assembled and another 2 are on site in KL. Instead of following the typical convention of naming the machines with individual names, they have gone with identifying the drives. The ones at Cochrane are named Cochrane 1 and Cochrane 2. Similarly, the one at Semantan now is Semantan 1. This helps them to identify the drives. The other 2 that are on site in KL are Semantan 2 and Inai 1.
jonc88
post May 14 2013, 12:07 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


user posted image
https://fbcdn-sphotos-b-a.akamaihd.net/hpho...656241858_n.jpg

user posted image
https://fbcdn-sphotos-e-a.akamaihd.net/hpho...141051819_n.jpg

Cochrane 1 on the right is digging the northbound tunnel (Towards Sungai Buloh). This one is also the lower tunnel at Pasar Rakyat and Bukit Bintang stations so will have to be dug first. Cochrane 2 on the left is digging the southbound tunnel (Towards Kajang) and will follow behind about 50m or so, with the upper tunnel.
jonc88
post May 26 2013, 04:45 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


user posted image
https://fbcdn-sphotos-e-a.akamaihd.net/hpho...944380098_n.jpg

From 22 May.
jonc88
post Jun 16 2013, 12:11 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


From my friend working on the project...

Cochrane 1 - 30 rings into main drive
Semantan 1 - has been launched already

Cochrane 2 - will be launched within 15 days
Semantan 2 - to launch in 2 weeks

4 TBMs due to start in the next 2 months.
jonc88
post Jun 16 2013, 10:02 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Each ring is 1.4m in length. So yes, approximately 42m in or so.

April 19th, KL Sentral

user posted image
https://fbcdn-sphotos-d-a.akamaihd.net/hpho...580027875_o.jpg

April 19th, Bukit Bintang

user posted image
https://fbcdn-sphotos-b-a.akamaihd.net/hpho...429225933_o.jpg
jonc88
post Jun 19 2013, 03:22 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(afosz @ Jun 19 2013, 03:00 PM)
Says who 2014 ? Expected completion date mid 2017.
*
No use replying. Just ignore. smile.gif I know some professionals working in there that do take their job seriously.
jonc88
post Jul 27 2013, 10:50 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


user posted image
https://fbcdn-sphotos-e-a.akamaihd.net/hpho...132966445_n.jpg

They've removed the temporary rings from the initial drive of Cochrane 1..
jonc88
post Jul 27 2013, 10:52 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(XtraSpicy @ Jul 6 2013, 06:45 PM)
Cochrane 1 and 2 also towards pasar rakyat... So ultimately towards sungai buloh.

Cochrane 3 will arrive at site by next week.
*
Correct, both are towards Sungei Buloh direction, but easier to visualise if its mentioned which bound is being bored.. smile.gif Cochrane 1 is Sungei Buloh bound (northbound) and Cochrane 2 is Kajang bound (southbound).. Has Cochrane 3 arrived already..?
jonc88
post Jul 28 2013, 09:16 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(XtraSpicy @ Jul 27 2013, 10:10 PM)
Yup, front sheild lowered down already. It was at site for quite some time already. Delayed due to site casting problems.
*
Thanks for the update..! smile.gif
jonc88
post Jul 31 2013, 03:44 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Cochrane 3

user posted image
https://fbcdn-sphotos-h-a.akamaihd.net/hpho...077047206_n.jpg

user posted image
https://fbcdn-sphotos-b-a.akamaihd.net/hpho...371092907_n.jpg
jonc88
post Aug 1 2013, 05:23 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


user posted image
https://fbcdn-sphotos-f-a.akamaihd.net/hpho...848481920_n.jpg

KL Sentral

user posted image
https://fbcdn-sphotos-c-a.akamaihd.net/hpho...733258323_n.jpg

Maluri: Excavation ahead of schedule
jonc88
post Aug 2 2013, 07:16 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Pasar Rakyat

user posted image
https://fbcdn-sphotos-d-a.akamaihd.net/hpho...266641407_n.jpg

user posted image
https://fbcdn-sphotos-e-a.akamaihd.net/hpho...423355139_n.jpg
jonc88
post Aug 6 2013, 12:18 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


Progress so far..

Cochrane 1 - 200m
Cochrane 2 - 35m
jonc88
post Aug 12 2013, 05:13 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


user posted image
https://fbcdn-sphotos-d-a.akamaihd.net/hpho..._40228913_n.jpg

QUOTE(spacelion @ Aug 12 2013, 01:04 PM)
does anyone have architect picture for kota damansara station? i think that's the one where they stack 2 platform on top of each other, i cant seem to visualize it.
*
Where did you hear that it is stacked..? As far as I know, the only stacked stations are Bukit Bintang and Pasar Rakyat..
jonc88
post Aug 12 2013, 10:03 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(spacelion @ Aug 12 2013, 07:29 PM)
when i look at all the m&e drawing, it is the only elevated station with more than 1 platform.
*
Haha, I see.. More than one platform doesn't mean stacked.. From what I know, there is supposed to be a depot nearby.. Perhaps this is an extra track for ease of allowing trains to enter or exit the main line from the depot.. smile.gif
jonc88
post Aug 12 2013, 10:23 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012



http://youtu.be/VA0t6MiIbjA

You can see that he mentions about the line to the depot from Kota Damansara station.. smile.gif
jonc88
post Aug 13 2013, 07:51 PM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(spacelion @ Aug 13 2013, 05:53 PM)
it's ok, i got the drawing to visualize, it is a stacked platform (top is southbound and bottom is northbound), sorry cant share it ya smile.gif
*
If so, quite interesting.. Would look something like Bangkok's Siam station I suppose..
jonc88
post Aug 14 2013, 10:34 AM

New Member
*
Newbie
0 posts

Joined: Oct 2012


QUOTE(elmond @ Aug 14 2013, 10:20 AM)
do this means kota damansara station will be the future exchange for mrt and mrt3 instead of sungai buloh?
*
Not very sure, but the media briefings have always shown Kota Damansara and Plaza Phoenix stations as interchanges.. Was told that the Sungei Buloh - Putrajaya line would pass through these stations..