QUOTE(johnkc610 @ Jun 27 2014, 05:21 PM)
Seriously, I can't accept Internet/Phone line did not considered a one of the neccessity (just like water and electricity) in your home.
No question that IOI built the house according to CCC requirement that the telephone line/fiber whether connect to telecom provider exchange, as long as it is ready in the house. BUT, as a master developer of the 16 phases township, I do believe it would be wise that IOI to rsponsible to ensure the completion of the necessity. How will IOI to convince future buyer to the township that IOI is building a great new township?
Sierra 8 (the very first phase of 16 Sierra) was built with Internet ready, but why does Sierra 1 (2nd phase) and Sierra 2 (3rd phase) doesn't built with Internet?
I will always ensure I will be very careful in my next purchase if the developer is always follow the CCC requirement; which it meant to me that will do what is require and wash hand leave the rest to the buyer, but not doing extra for the buyer, as well as the developer "brand", win-win purpose.
No question that IOI built the house according to CCC requirement that the telephone line/fiber whether connect to telecom provider exchange, as long as it is ready in the house. BUT, as a master developer of the 16 phases township, I do believe it would be wise that IOI to rsponsible to ensure the completion of the necessity. How will IOI to convince future buyer to the township that IOI is building a great new township?
Sierra 8 (the very first phase of 16 Sierra) was built with Internet ready, but why does Sierra 1 (2nd phase) and Sierra 2 (3rd phase) doesn't built with Internet?
I will always ensure I will be very careful in my next purchase if the developer is always follow the CCC requirement; which it meant to me that will do what is require and wash hand leave the rest to the buyer, but not doing extra for the buyer, as well as the developer "brand", win-win purpose.