> Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!

views
     
unig
post Nov 9 2012, 11:21 PM

Getting Started
**
Junior Member
152 posts

Joined: Sep 2009


Those LRT structures at Puchong.... not scared sink ar later since Puchong is one big ex-mining hole hehe
unig
post Nov 10 2012, 04:03 PM

Getting Started
**
Junior Member
152 posts

Joined: Sep 2009


QUOTE(stimix @ Nov 10 2012, 03:19 PM)
If sked sink... ppl got references elsewhere in Klang Valley liao since Puchong still new.. all houses less than 20 yrs.. can refer to longer established ex-mining land & also ex-lakes regions such as the whole of Pandan Jaya in KL.. all timus Tanah wan and already >30 yrs.. Those houses & flats there still stayed strong on top of Tanah timbus  biggrin.gif
*
stimix I just kidding lar.... dont lar terasa hehehe
unig
post Nov 18 2012, 09:29 AM

Getting Started
**
Junior Member
152 posts

Joined: Sep 2009


QUOTE(stimix @ Nov 18 2012, 09:14 AM)
Taken Yesterday.. Progress near USJ19 mall

user posted image
*
Usj 19 much faster than puchong hence usj>puchong
unig
post Dec 26 2012, 07:06 PM

Getting Started
**
Junior Member
152 posts

Joined: Sep 2009


Taken yesterday in front of USJ19 Digital Mall.... the progress at USJ side is very fast! I think they might be able to complete on time or even faster!

user posted image

Stimix, Puchong side how's the progress? From what I see 2020 also not yet finish la.... hahahaha
unig
post Dec 27 2012, 11:17 PM

Getting Started
**
Junior Member
152 posts

Joined: Sep 2009


QUOTE(jonc88 @ Dec 26 2012, 10:42 PM)
That's an awesome shot unig. smile.gif Looking at how things are going, I think that the Kelana Jaya line extension should meet the 2014 target. The Ampang line side though, is unfortunately held up by land issues. What to do? At least Subang Jaya and USJ residents won't need to put up with so much dust and inconvenience as the Puchong residents nor the traffic issues once the line becomes operational. Better to hope that all goes according to plan now and no slacking off since the deadline has been revised to 2015.
*
Thanks mang.... wait I go there again in another 2 weeks see whats the progress.... it's gonna connect to the other side (near the apartment at USJ16 adjacent to LDP).... that part the pillars up already
unig
post Apr 8 2013, 12:54 PM

Getting Started
**
Junior Member
152 posts

Joined: Sep 2009


QUOTE(stimix @ Apr 8 2013, 12:47 PM)
I passing by Stn 12 site everyday during weekday on my way back home bypassing the USJ-Puchong toll  blush.gif  (Well not really due to kiamsiap but escaping the jam after the toll  rclxms.gif )

What I can say till last Friday Evening when I passed this stn12 & surrounding area - Not even a single soil works  doh.gif .. However on the other side of the river at Putra Height site, I can see soil testing and also cranes far away..  cry.gif ..Damn to MRCB  vmad.gif
*
Station 12 is puchong intan right?
unig
post Apr 8 2013, 10:37 PM

Getting Started
**
Junior Member
152 posts

Joined: Sep 2009


QUOTE(stimix @ Apr 8 2013, 10:30 PM)
OK, Taken the actual site of stn 12 (in red circle) this Evening just b4 7pm. - Nothing at all - semak samun  biggrin.gif

user posted image
*
user posted image