QUOTE(No Reason @ Jan 29 2012, 01:45 PM)
Actually its the other way round..its to test the pile whether size and depth of the piling is enough to carry load as per intended design
*
both are right.. 2 types.....1) test to determined 2) working load test smile.gif ... .. i prefer statnamic load test heheh kaboomm...