No Reason
post Jan 29 2012, 05:40 PM

Getting Started
**
Junior Member
62 posts

Joined: Aug 2011


QUOTE(newbi3s @ Jan 29 2012, 04:59 PM)
LRT extension project just setup in Putra Heights. It is very near to my office, same row. The land for Putra Heights station just cleared and leveled. Looking forward for the project. I will shoot some photo once I have free time.
*
As I heard, some residence at Putra Height are against this LRT project, or LRT alignment at Putra Height to be exact
No Reason
post Jan 29 2012, 05:45 PM

Getting Started
**
Junior Member
62 posts

Joined: Aug 2011


QUOTE(mrsafwan @ Jan 17 2012, 01:11 PM)
that is static load testing. to know the soil bearing ratio. further to determine the size and depth of piling required.
*
Actually its the other way round..its to test the pile whether size and depth of the piling is enough to carry load as per intended design
No Reason
post Mar 9 2012, 11:03 PM

Getting Started
**
Junior Member
62 posts

Joined: Aug 2011


QUOTE(stimix @ Mar 9 2012, 09:35 PM)
8/9/10 of which line?

If u mean Ampang line, Stn 8 is located at between the Rakan Muda & indian Temple opposite bdr puteri, Currently that area has been fenced-up wth blue fencing.. Not sure what inside as can't see.. However nothing at stn 9 (Puterui Mart/Tractor) & stn 10Puchong Pernana Complex

If u mean KJ line, 2 weeks ago the area between Wawasan school & USJ19 mall already barricaded wth plastic divider. but no progress at stn 8 & 10
*
erm, actually major work already started at Station 8 Kelana jaya line since 3 days ago.

there's only a small barrier there, so u can actually see what they are doing at the middle of the road there