Outline ·
[ Standard ] ·
Linear+
Ultimate LRT extension construction update thread!, Ara Damansara, USJ, Puchong!
|
TSKampung2005
|
Dec 22 2013, 08:06 PM
|
Proudly Kampungite, will always be one.
|
QUOTE(lilzany @ Dec 22 2013, 08:05 PM) Station is taking shape. I just can't wait. I wonder if the new stations they plan for 6 car trains? As far as I was told, the length of each stations, whether it is Ampang line or Kelana Jaya line, correspond to the length of existing trains.
|
|
|
|
|
|
TSKampung2005
|
Dec 22 2013, 08:22 PM
|
Proudly Kampungite, will always be one.
|
QUOTE(lilzany @ Dec 22 2013, 08:19 PM) how then are they going to go from 4 car to a 6 car train when the needs arise? now from what i see the 4 cars are already stretch from end to end of the platform. For Kelana Jaya line, there is no plan for longer trains, but there will be more trains, in even shorter intervals.
|
|
|
|
|
|
TSKampung2005
|
Jan 7 2014, 09:53 PM
|
Proudly Kampungite, will always be one.
|
Source : https://twitter.com/MyRapidKLAround Lembah Subang depot, after station 1 of Kelana Jaya line extension (3/1/2014)
|
|
|
|
|
|
TSKampung2005
|
Jan 7 2014, 11:11 PM
|
Proudly Kampungite, will always be one.
|
Photos by sapphire blueThe Summit USJ Uploaded with ImageShack.us Uploaded with ImageShack.us
|
|
|
|
|
|
TSKampung2005
|
Jan 8 2014, 07:38 PM
|
Proudly Kampungite, will always be one.
|
|
|
|
|
|
|
TSKampung2005
|
Jan 9 2014, 10:34 AM
|
Proudly Kampungite, will always be one.
|
QUOTE(clearcase @ Jan 9 2014, 09:38 AM) Wow those stairs are so high Minimum 5.4 m
|
|
|
|
|
|
TSKampung2005
|
Jan 9 2014, 10:39 AM
|
Proudly Kampungite, will always be one.
|
|
|
|
|
|
|
TSKampung2005
|
Jan 13 2014, 08:09 AM
|
Proudly Kampungite, will always be one.
|
|
|
|
|
|
|
TSKampung2005
|
Jan 13 2014, 08:10 AM
|
Proudly Kampungite, will always be one.
|
|
|
|
|
|
|
TSKampung2005
|
Jan 16 2014, 11:19 AM
|
Proudly Kampungite, will always be one.
|
QUOTE(lilzany @ Jan 15 2014, 04:03 PM) i heard that the klang lrt would ended up here. there is so much news and videos about how the MRT stations are being built but nothing on the LRT by Prasarana. It almost looks like it is an oversight to complete and to further expand the hastily planned lines. so far the the future transfer station is awesome and lots of work are being done to make it a smooth transit. not like the fail Dang Wangi/Bukit Nanas, KL Sentral LRT to Monorail, and last but not least Masjid Jamek, the ever incredible one system two stations...they even call it transit stations? They were failures made in the past. Made when you have totally separate operators and each line was planned by its own firms
|
|
|
|
|
|
TSKampung2005
|
Jan 18 2014, 12:51 AM
|
Proudly Kampungite, will always be one.
|
|
|
|
|
|
|
TSKampung2005
|
Jan 30 2014, 10:22 PM
|
Proudly Kampungite, will always be one.
|
Kelana Jaya line extension update (photos by dengilo)Station 1  Trackworks around Lembah Subang depot   Towards Putra Heights
|
|
|
|
|
|
TSKampung2005
|
Feb 27 2014, 07:41 PM
|
Proudly Kampungite, will always be one.
|
QUOTE(davkong @ Feb 27 2014, 07:39 PM) Pusat Bandar Puchong ST07 progress today. Still very very slow, just foundations for the station and multistory (?) car park.  I wonder if they can make it for March 2016.
|
|
|
|
|
|
TSKampung2005
|
Mar 2 2014, 12:30 AM
|
Proudly Kampungite, will always be one.
|
QUOTE(Ancient-XinG- @ Mar 1 2014, 10:48 PM) yes, this is otw to klang on federal highway If that one, then it should be the KL-Klang BRT
|
|
|
|
|