Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Raling & Balustrades, urgent!

views
     
TSKelvin5717
post Jan 12 2012, 04:24 PM, updated 14y ago

Enthusiast
*****
Senior Member
742 posts

Joined: Apr 2008

Hi Guys,

need to do temp glass railing / balustrades for my staircase.. and appreciate if someone can share a contact for this purpose ?

got a quot from YTL glass however heard feedback that their service is very lousy..

urgently need to do it anyone please share the info thanks
wrb7878
post Jan 12 2012, 04:52 PM

Enthusiast
*****
Senior Member
843 posts

Joined: Oct 2008


QUOTE(Kelvin5717 @ Jan 12 2012, 04:24 PM)
Hi Guys,

need to do temp glass railing / balustrades for my staircase.. and appreciate if someone can share a contact for this purpose ?

got a quot from YTL glass however heard feedback that their service is very lousy..

urgently need to do it anyone please share the info thanks
*
Hi, i did ask few b4.
cost all around RM200-260/feet.

I ask for model : (BL-R024) Glass staircase
http://www.glassnetwork.com.my/pages/produ...rcase-glass.php


Added on January 12, 2012, 4:54 pmBerjaya 1 is cheaper around RM170-180/feet, but the design is not look modern. round stand compare to square look modern.

SHG 5 ( W/TEMPERED GLASS )
http://www.berjayasteelrailings.com/index....e-handrail.html


Added on January 12, 2012, 4:56 pmcan check with http://www.honglee.com.my too

This post has been edited by wrb7878: Jan 12 2012, 04:56 PM
kelvyn
post Jan 12 2012, 05:42 PM

Look at all my stars!!
*******
Senior Member
3,173 posts

Joined: May 2007
could try the followings....

E Neng Marketing

GBS Worldwide


wrb7878
post Jan 13 2012, 10:05 AM

Enthusiast
*****
Senior Member
843 posts

Joined: Oct 2008


QUOTE(kelvyn @ Jan 12 2012, 05:42 PM)
could try the followings....

E Neng Marketing

GBS Worldwide
*
Good. i can ask another quotation again.
So far the cheaper i get is RM220/feet.
TSKelvin5717
post Jan 13 2012, 01:35 PM

Enthusiast
*****
Senior Member
742 posts

Joined: Apr 2008
got respond for the following suggestion;


1. Hong Lee, waiting for them to call me back.
2. E Neng Marketing, must come for site inspection before giving quotation, tentative tomorrow 10am.
3. Glassnetwork, temp glass per foot run will be 130 - 150, stainless steel railing Rm250 per set (5ft per set if not mistaken) but they will come for site inspection for more accurate quot, tenttive thursday 10am.
the rest still waiting for respond..

This post has been edited by Kelvin5717: Jan 13 2012, 01:43 PM
wrb7878
post Jan 14 2012, 10:46 PM

Enthusiast
*****
Senior Member
843 posts

Joined: Oct 2008


QUOTE(Kelvin5717 @ Jan 13 2012, 01:35 PM)
got respond for the following suggestion;
1. Hong Lee, waiting for them to call me back.
2. E Neng Marketing, must come for site inspection before giving quotation, tentative tomorrow 10am.
3. Glassnetwork, temp glass per foot run will be 130 - 150, stainless steel railing Rm250 per set (5ft per set if not mistaken) but they will come for site inspection for more accurate quot, tenttive thursday 10am.
the rest still waiting for respond..
*
E neng quote me 10feet, 12mm tempered glass with stainless steel raining RM2300.

leesa
post Apr 6 2012, 11:29 PM

Getting Started
**
Junior Member
196 posts

Joined: Mar 2009


QUOTE(Kelvin5717 @ Jan 13 2012, 01:35 PM)
got respond for the following suggestion;
1. Hong Lee, waiting for them to call me back.
2. E Neng Marketing, must come for site inspection before giving quotation, tentative tomorrow 10am.
3. Glassnetwork, temp glass per foot run will be 130 - 150, stainless steel railing Rm250 per set (5ft per set if not mistaken) but they will come for site inspection for more accurate quot, tenttive thursday 10am.
the rest still waiting for respond..
*
QUOTE(wrb7878 @ Jan 14 2012, 10:46 PM)
E neng quote me 10feet, 12mm tempered glass with stainless steel raining RM2300.
*
hi guys, how is your experience dealing with E Neng so far? I must say that it was really frustrating dealing with them. I don't know if it's the salesperson who's not doing his job properly or the company. I have a quotation given to me dated 29/2 and til today, they can't get the design right. Designer keep drawing wrong stuff, salesperson keep delaying appointments.. 1 month+ just to finalize a grill purchase? So tiring... shakehead.gif
weikee
post Apr 6 2012, 11:54 PM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(leesa @ Apr 6 2012, 11:29 PM)
hi guys, how is your experience dealing with E Neng so far? I must say that it was really frustrating dealing with them. I don't know if it's the salesperson who's not doing his job properly or the company. I have a quotation given to me dated 29/2 and til today, they can't get the design right. Designer keep drawing wrong stuff, salesperson keep delaying appointments.. 1 month+ just to finalize a grill purchase? So tiring...  shakehead.gif
*
My house grill using E Neng, was ok during my time.
leesa
post Apr 7 2012, 12:21 AM

Getting Started
**
Junior Member
196 posts

Joined: Mar 2009


QUOTE(weikee @ Apr 6 2012, 11:54 PM)
My house grill using E Neng, was ok during my time.
*
Who was your salesperson? I called up the manager and requested for a change of salesperson but she asked the same fella to attend to me. Apparently their designer quit, and then their designer from another outlet is not experienced bla bla..

But several forumers here recommend E Neng and I saw their catalog, the works looks good
weikee
post Apr 7 2012, 08:32 AM

10k Club
********
All Stars
12,019 posts

Joined: Jan 2003
QUOTE(leesa @ Apr 7 2012, 12:21 AM)
Who was your salesperson? I called up the manager and requested for a change of salesperson but she asked the same fella to attend to me. Apparently their designer quit, and then their designer from another outlet is not experienced bla bla..

But several forumers here recommend E Neng and I saw their catalog, the works looks good
*
Mine was a lady.

I don't wait for their design. I do my own design and give it to them.
leesa
post Apr 8 2012, 12:45 AM

Getting Started
**
Junior Member
196 posts

Joined: Mar 2009


QUOTE(weikee @ Apr 7 2012, 08:32 AM)
Mine was a lady.

I don't wait for their design. I do my own design and give it to them.
*
same here. i did my own designs too. i sketched the designs on paper and their designer was supposed to come back with the final drawings so that we can proceed. but they dont follow what i have sketched or either fail to send me the complete set of drawings. when i asked the salesperson Drawing A is for which part of the house, he said he doesnt know. omg

 

Change to:
| Lo-Fi Version
0.0208sec    0.51    5 queries    GZIP Disabled
Time is now: 23rd December 2025 - 04:45 AM