Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Zefer Hill Residence, new launch

views
     
viper88
post Apr 14 2015, 10:54 PM

Look at all my stars!!
*******
Senior Member
2,359 posts

Joined: Apr 2006


JMB can tackle this issues, just highlight the safety concern.
Piping is not a big issues, plastered ceiling easily cover it with renovation.


QUOTE(obee @ Apr 14 2015, 02:47 PM)
building safety issue. the fencing around the building parameter is laughable. any average adult can climb over and access the basement car park. what happens next is up to your imagination wink.gif

big piping on top of kitchen ceiling? LOL. it is also in zefer. probably a signature of Villamas. best tell your sis to find a good contractor for the ceiling.
*
This post has been edited by viper88: Apr 14 2015, 10:58 PM
viper88
post Apr 15 2015, 11:20 AM

Look at all my stars!!
*******
Senior Member
2,359 posts

Joined: Apr 2006


Yes, the DB box can be concealed with kitchen cabinet.. just sacrifice one storage space only.
Same goes for the exposed piping at the kitchen ceiling, do plastered ceiling to conceal it.

Since new condo usually need some renovation can nego with contractor to give discount for those 2 odd placing item when do kitchen cabinet renovation & plastered ceiling.



QUOTE(obee @ Apr 15 2015, 11:00 AM)
Before that servo dude come in blasting his thoughts again, I thank you for your feedback. Finally some constructive discussion whistling.gif

I do agree with simple ID design with the kitchen cabinet the DB box can be concealed. Fine by me. Extra money to be spent and less space for storage. Oh well. Life is full of surprises.

Same as the piping at the top corner of the ceiling. If placed at Wet Kitchen/Yard area then the owners have a choice to plaster or not. In this case, no choice lor. Lol.

Again, as a first time buyer I have my concerns and doubts with my first property. Just hope the sifus and taikors here can help guide/share knowledge. If I said something wrong then I apologize. Peace... icon_rolleyes.gif
*
viper88
post Apr 15 2015, 09:54 PM

Look at all my stars!!
*******
Senior Member
2,359 posts

Joined: Apr 2006


Living room on air-cond, or when heavy rain days.... condo living room humidity oso increase...
so higher risk for main switch box ? brows.gif

QUOTE(d.storey @ Apr 15 2015, 06:56 PM)
maybe from the pic it doesnt look that high. But i agree with complainer it shdnt put in kitchen becuz humidity is higher there. So we tempt to hv impression it will hv higher chance to break down or cause fire
*
viper88
post Apr 29 2015, 11:25 AM

Look at all my stars!!
*******
Senior Member
2,359 posts

Joined: Apr 2006


Completed project after handout to buyer still under developer warranty for about 1-2 yrs dpds on projects.
If developer don't want to/cant fix it then its a main issues for the buyer.

Usually those investor/flippers want to sell fast at high price will get hit coz
of workmanship issues.. they lost on interest pymt to bank and hard 2 sell off with low price ...so start to
rumble and grumble....

My sister also bought Zefer hill, so far she steady only... laugh.gif



QUOTE(Dracula_X @ Apr 27 2015, 10:33 PM)
Hmm ... VM has to solve all the issues to satisfy the owners, else all his future projects will be in trouble.
*

 

Change to:
| Lo-Fi Version
0.0408sec    0.52    7 queries    GZIP Disabled
Time is now: 4th December 2025 - 09:38 PM