QUOTE(adrianjc @ Nov 13 2011, 07:11 AM)
This is my house in PJ, am currently in the midst of renovation works.
Most of the masonry work has been completed, wiring is almost done, aircond, water & sewage piping have both been completed.
At the moment it's about 70% completed.
Original Facade

All the walls have come crumbling down

1st floor rear room extension


Majority of the walls on 1st floor taken down

Staircase repositioned for space optimization

Door frames delivered and syelek'ed

Front facade torn down

Front facade rebuilt with new car porch.

New lay-out of the ground floor with 10ft ground floor extension

Progress is going so far, so good.... getting the wiring completed within next week so that the plaster ceiling guy can start work. Another 2-3 months to completion, maybe...
nice reno there...Most of the masonry work has been completed, wiring is almost done, aircond, water & sewage piping have both been completed.
At the moment it's about 70% completed.
Original Facade

All the walls have come crumbling down

1st floor rear room extension


Majority of the walls on 1st floor taken down

Staircase repositioned for space optimization

Door frames delivered and syelek'ed

Front facade torn down

Front facade rebuilt with new car porch.

New lay-out of the ground floor with 10ft ground floor extension

Progress is going so far, so good.... getting the wiring completed within next week so that the plaster ceiling guy can start work. Another 2-3 months to completion, maybe...
how much??