QUOTE(andrewlimkn @ Jun 25 2012, 02:04 PM)
Sure different. It depends when they are going to tamped the S&P..The Leafz @ Sg Besi, Hot Selling now!
The Leafz @ Sg Besi, Hot Selling now!
|
|
Jun 26 2012, 10:04 AM
Return to original view | Post
#101
|
![]() ![]()
Junior Member
210 posts Joined: Dec 2011 |
|
|
|
|
|
|
Jun 26 2012, 05:18 PM
Return to original view | Post
#102
|
![]() ![]()
Junior Member
210 posts Joined: Dec 2011 |
|
|
|
Jul 26 2012, 10:48 AM
Return to original view | Post
#103
|
![]() ![]()
Junior Member
210 posts Joined: Dec 2011 |
How the construction?? The pilling finish ady??
|
|
|
Aug 14 2012, 10:15 AM
Return to original view | Post
#104
|
![]() ![]()
Junior Member
210 posts Joined: Dec 2011 |
I think the construction a bit slow..for the kiara residence 2 and le yuan Ady finish the pilling and construct till 3rd-5th floor Ady.
|
|
|
Aug 30 2012, 12:50 AM
Return to original view | Post
#105
|
![]() ![]()
Junior Member
210 posts Joined: Dec 2011 |
QUOTE(bkwoh @ Aug 30 2012, 12:19 AM) Well.. sometimes it's good to see some housing project is ahead of schedule if but it may not good hear that as if is completed too ahead of schedule as 'something' might have missed/ignored because of rushing, rushing and rushing... I rather see the project is on going, completed on schedule or behind schedule (u will get compensation from developer due to that but not likely it will happen). So what's the worries here anyway?? We only start worry if The Leafz project is stopped or not able to complete by 2015 as stated in the S&P (hopefully it won't be happened as well). Yes. U r right. Normally got DIBs scheme, then the developer will rush to built it. Actually the leafz still on track and won't be delay coz normally pilling will use more time. Once done it, u will see the building floor by floor very fast just like the tree.. |
|
|
Sep 3 2012, 01:04 PM
Return to original view | Post
#106
|
![]() ![]()
Junior Member
210 posts Joined: Dec 2011 |
|
|
|
Sep 6 2012, 10:54 PM
Return to original view | Post
#107
|
![]() ![]()
Junior Member
210 posts Joined: Dec 2011 |
I'm Js visit the sales gallery..quite expensive.but location quite nice there
|
|
|
Oct 28 2012, 02:27 AM
Return to original view | Post
#108
|
![]() ![]()
Junior Member
210 posts Joined: Dec 2011 |
Please dun create lots of rumors here. Pilling and sctructure of the building is done by different contractor. Now Js finish the pilling only. Waiting the other contractor building the structure. It's just need time to move the tower crane to the construction site.
|
|
Topic ClosedOptions
|
| Change to: | 0.0240sec
1.03
7 queries
GZIP Disabled
Time is now: 24th December 2025 - 01:25 PM |