1. All hacking work for electrical wirings. Power points, alarm, etc
2. All hacking work for auto gate wiring, rail (if using folding gate or sliding gate)
3. All hacking work for aircon piping (if they are not back-to-back installation)& wiring
4. Plastering of all hacked surface and splash back mosaic
5. Painting work
6. Kitchen cabinet, hood, oven and hobs – KC supplier
7. Wardrobes and furniture
8. Install aircons
9. Install autogate system
10. painter come back to touch up
*