Hi, please quote for me
Bathroom Master
1. removing existing half wall tiles, floor, wood door border, WC, basin and bathtub
2. removing existing windows (2ft height), remake a smaller windows (1ft)
3. re-tiling full wall and floor (not include tiles)
4. elevation border (shower area so that water cannot reach out, will put a shower screen on top)
5. brick up the additional 1ft of the window
6. ventilation fan area on brick wall include wiring point (not include fan)
7. concealing existing water tap/main tap
8. plaster ceiling with area for ventilation and 2 down lights
9. create a concrete tabletop with tiles skirting (6ft X 2ft)
10. installation of new countertop basin and WC (not include basin and WC)
11. box-up visible pipes L-box (pipes is from unit above to floor) 2ft X 1ft
12. water proofing
13. installation of tank type water heater (include copper and wiring). Will hang outside the window
14. new piping works (not include valve and shower head)
15. small water pump to pump water from water heater tank to shower
16. installation of shower screen (not include shower screen)
17. installation of new bi-fold door with PVC edge (not include door)
renovation quotation, question & problem, Renovation work
Oct 19 2011, 05:12 PM
Quote
0.0161sec
0.67
7 queries
GZIP Disabled