 My Family House Construction, budget slippage

views
     
vatiore
post Aug 30 2011, 05:56 PM

Getting Started
**
Junior Member
77 posts

Joined: Jun 2011
QUOTE(RS232C @ Aug 29 2011, 11:39 AM)
I only know the surface of the detailing works. She gave me the quotation to release the budget however i decline to release it.  it just that i dont like the wiring contractor all 3 of them and i would like to open my options open as of now, my dateline to get few other quotation is 2nd week of September.

Construction will stop for almost 2 weeks as all workers going back for raya. thus im taking this opportunity to seek for one. else we will proceed with the one in hand and cant cut the cost for wiring and have to cut from other section.
the one i listed is the one comes under RM35K quote. the other 60K quote have bunch of other listing including unnecessary 6 nos commando plug located outside the house (couple each location)
*
Estimate RM3k for each bathroom for copper pipe + cold water piping
Would advise to add pump for better water pressure
Stainless steel water tank x2, location to install also important.
Design the cold water piping when no electricity supply you still have water supply either from water tank or direct to your toilet

 

Change to: