Anyone collected keys yet and anything to lookout for?
Will be collecting the keys tomorrow and would like to gain some tips from existing owners.
Investment Subang Parkhomes by Titijaya, Condo
Investment Subang Parkhomes by Titijaya, Condo
|
|
Dec 9 2013, 11:49 AM
Return to original view | Post
#1
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
Anyone collected keys yet and anything to lookout for?
Will be collecting the keys tomorrow and would like to gain some tips from existing owners. |
|
|
|
|
|
Dec 10 2013, 09:29 PM
Return to original view | Post
#2
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
Had an extremely outrageously bad experience with the handover of keys.
Was checking my unit out with the management office on the defects and found an ridiculous amount of defects. The list is as follow: 1. Master bedroom sink free play/shaking 2. Timber flooring skirting on all bedrooms have gaps/ scratches & discolouration 3. Hollow bathroom tiles 4. Paint overspill on all bathroom ceilings 5. Master bathroom bath tub is scratched 6. Most room plaster ceilings including the living room is wavy 7. Door locks not properly aligned & some lock sets are defective 8. There are holes/gaps in the grouting for the tiles 9. Marble skirting are broken 10. Paint spillage on window frames The last straw was that I found termites in the timber flooring & almost 90% of the marble tiles in my living/ dining/ kitchen area are hollow. Seriously WTF. I rejected taking vacant possession of the unit and will write a serious & stern letter to the developer, solicitor & management office. To all PH owners, be extremely wary & do not blindly take possession of the unit (even though after 14 days of issuance of letter, the purchaser is deemed to have take possession according to S&P). In the end, we still get screwed in the ass. |
|
|
Dec 11 2013, 03:12 PM
Return to original view | Post
#3
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
QUOTE(doraemonkiller @ Dec 10 2013, 11:44 PM) Not too sure about that bro but I would safely assume that if my unit has it, then other units will have similar issues as well.My worst fear is the termite as they will spread everywhere and it will affect other fellow PH owners as well. Imagine the stress and cost involved to eradicate the menace. |
|
|
Dec 17 2013, 05:11 PM
Return to original view | Post
#4
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
QUOTE(urb7 @ Dec 11 2013, 03:15 PM) Any photos of actual unit or surrounding? I remember visiting the showgallery and was outraged by the pricing. There were some photos posted a few pages back.QUOTE(kenny2501 @ Dec 16 2013, 11:26 PM) So, how's the unit bro? Everything ok?AFAIK, there aren't any pages yet. |
|
|
Dec 18 2013, 01:02 PM
Return to original view | Post
#5
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
QUOTE(kenny2501 @ Dec 17 2013, 10:14 PM) QUOTE(kenny2501 @ Dec 17 2013, 10:22 PM) hi endless, what ur unit? im from Block B, Yah, you're right. The amount of minor defects is just outrageous. That being said, those are still minor and can be easily touched up.dont u feel block B entrance is not welcoming and look cheap by furnish with CEMENT FLOORING ! and also No COVER ON TOP , imagine when visitor/friends waiting at the block entrance when raining day. Are all your floor/ wall tiles alright? Double check for termite infestation. I'm from Block B as well bro and it's exactly like you said. |
|
|
Dec 19 2013, 08:47 AM
Return to original view | Post
#6
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
QUOTE(kenny2501 @ Dec 18 2013, 09:57 PM) we go complaint GAO GAO la..... should organize all owner go to complaint the developer. somemore no really Green COncept for paying RM0.35 per sqft maintenance... Can, but will need to gather more ppl first. 2 voices is too few.QUOTE(661188 @ Dec 18 2013, 11:13 PM) Aye. |
|
|
|
|
|
Dec 20 2013, 04:42 PM
Return to original view | Post
#7
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
QUOTE(doraemonkiller @ Dec 19 2013, 12:22 PM) For me it's own stay.QUOTE(kenny2501 @ Dec 20 2013, 08:39 AM) Done.https://www.facebook.com/subangph On a side note, just received a call from the management office. According to them, my unit's problems will be solved by 30/12/13. Am surprised at the fast reply (could be attributed due to my daily calls to them). I've also warned them I'm prepared to go in guns blazing should other defects be found (not in the inspection lists) and not resolved while they are at it. |
|
|
Dec 21 2013, 01:55 PM
Return to original view | Post
#8
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
QUOTE(kenny2501 @ Dec 20 2013, 04:49 PM) Standard is 30 days but I'm skeptical that it can be done by month end. I'm sure there'll be minor stuff to work on. Was hoping to move in before CNY but seems like its a shattered dream. Also, last I heard there are 11-12 residents who've shifted in already. QUOTE(doraemonkiller @ Dec 20 2013, 11:09 PM) Block G is the one still under construction yah bro?You just pretend to be a customer interested in viewing the units if they don't let you in. |
|
|
Dec 24 2013, 10:27 AM
Return to original view | Post
#9
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
Just got an official reply from the management office. Unit's defects will be repaired and ready by 6/1/14.
|
|
|
Jan 2 2014, 04:54 PM
Return to original view | Post
#10
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
|
|
|
Jan 3 2014, 05:38 PM
Return to original view | Post
#11
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
|
|
|
Jan 15 2014, 10:59 AM
Return to original view | Post
#12
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
QUOTE(ceveori @ Jan 14 2014, 06:30 PM) it seems one way traffic from Empire and Subang Parade to this place. any alternate road to go Empire from here? No, there isn't bro. The route only leads to Soho & Parkhomes.QUOTE(kenny2501 @ Jan 9 2014, 01:26 PM) My assessment rate (Senarai Nilaian) is RM840 and I've also received a property tax (Cukai Taksiran) notice which is RM420.Anyone received the tax notice as well? Also an update on my unit. Went to see the management office last week. Another excuse & delay from the contractor. Was initially promised end of Dec 2013, pushed to 1st week of 2014 and now finally it's on the 22nd of this month. Am contemplating whether to take legal action as it will involve cost and very time consuming. |
|
|
Jan 18 2014, 09:03 AM
Return to original view | Post
#13
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
QUOTE(foosh @ Jan 17 2014, 11:08 PM) Termites is bad show! Did management propose any mitigation before it spreads to the top? They've changed the tune of their story now to woodworms.Your neighbors should be equally concerned. No, they did not. QUOTE(CMW123 @ Jan 17 2014, 11:13 PM) Exactly. I'm doubtful that it can be completed by the deadline. |
|
|
|
|
|
Jan 24 2014, 05:33 PM
Return to original view | Post
#14
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
Just came back from my so called second joint inspection.
Was shocked to find my unit was far from completed. The entire living/dining/kitchen tiles was already hacked off (they were supposed to change all) and the tiles weren't started on yet. Majority of my list of defects were still untouched. Gawd, my blood pressure is rising fast. |
|
|
Apr 4 2014, 01:46 PM
Return to original view | Post
#15
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
QUOTE(fuzzy @ Apr 4 2014, 12:48 AM) Anyone staying there now? Am aiming a unit in Block F .. How is it so far? Any particular floor we should focus on getting? There are a few ppl staying there now.What should I pay attention to when I go house viewing this weekend? Thanks bros, hope to be your neighbour soon. As for defects, I can share some of mine with you. - Hollow tiles for living & bathroom area - Misaligned timber strips for all bedrooms (if your unit has this) - Wavy ceiling |
|
|
Apr 5 2014, 03:28 PM
Return to original view | Post
#16
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
|
|
|
Apr 13 2014, 09:40 PM
Return to original view | Post
#17
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
QUOTE(fuzzy @ Apr 7 2014, 07:45 PM) 4k above 1mil. 2 carparks, wood flooring for the bedrooms, 4 air conds, marble flooring, i think got wardrobe and kitchen done up as well. 9% rebate (so u pay 1% upfront) and some other extra goodies upon VP. Congrats bro. I attached the price list, but apologies for the poor quality.. QUOTE(foosh @ Apr 11 2014, 10:54 PM) Problems were resolved and got the keys late February. Now am hunting around for quotations for the reno and hope to start by end of this month if all goes well. |
|
|
Apr 14 2014, 12:37 PM
Return to original view | Post
#18
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
|
|
|
Apr 15 2014, 07:17 AM
Return to original view | Post
#19
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
QUOTE(fuzzy @ Apr 14 2014, 01:27 PM) Looks good Yea, I concur. The shower head is also directly facing the door in the utility toilet. Are you planning to do anything with the bathroom? I really don't like the placement of the shower. If someone swing open the door, might hit you in the face. Or worst, being so close to a constant source of water means the wood will deteriorate fast. Don't know which smart pants go design to such a manner I plan to: 1. Remove the shower area glass and shift the sink to that area (master toilet) 2. Move the doer orientation to swing the other way to avoid any accidents or install a sliding door (master toilet) 3. Remove tub and install glass door (master toilet) 4. Replace door to a plastic type (utility toilet) QUOTE(dlyw1103 @ Apr 14 2014, 05:00 PM) Here you go... 5 months later (hopefully) can update renovated condition Nails, yours is facing the school I see. The design looks abit different, it's the condo type?[attachmentid=3930176] [attachmentid=3930183] [attachmentid=3930190] [attachmentid=3930191] [attachmentid=3930219] QUOTE(foosh @ Apr 15 2014, 12:18 AM) Thanks, you've just reminded me that I have one more last defect to sort out. |
|
|
Apr 15 2014, 07:22 AM
Return to original view | Post
#20
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,316 posts Joined: Jan 2003 From: -Lan Kwai Fong- |
|
| Change to: | 0.0224sec
0.77
7 queries
GZIP Disabled
Time is now: 15th December 2025 - 11:53 AM |