QUOTE(kelho @ Aug 12 2011, 12:47 AM)
Hi, I need some advice on bathroom renovation.
I've been given a quotation:
"To dismantle and fix new tiles for 5 1/2 x 9' bathroom - RM4,100"
"To dismantle and fix new tiles for 112" x 51" bathroom - RM4,300"
I know, it's very vague right? I don't even know if this includes the price of the tiles, or am I too naive to think that it does? I'm totally clueless when it comes to this, so please bear with me. If I want to redo my wall and floor tiles, is it normal for the contractor to quote me ONLY the labour charges (hacking, cement, laying new tiles..), and is this RM4,100 and RM4,300 the labour charges, or do you think this includes the new tiles?
I got this quotation from the contractor through an ID (who emailed it to me), and I've not gotten a reply from her about my above queries yet. Just wanted to some advice from people who are well-versed in this.
I would also like to obtain some recommendations on good bathroom contractors from you guys who've been through this (and survived haha!).. I need another quotation to make a comparison with this one that I got. Or... how many quotations does one need actually huh? Please drop me a note. Thanks. - Kel.
Is 4,100 considered cheap? Wah then my one only cost RM1.3k, include hack and retile, change basin and toiletbowl, and do copper piping is like super cheap woh.. (prices not include materials)I've been given a quotation:
"To dismantle and fix new tiles for 5 1/2 x 9' bathroom - RM4,100"
"To dismantle and fix new tiles for 112" x 51" bathroom - RM4,300"
I know, it's very vague right? I don't even know if this includes the price of the tiles, or am I too naive to think that it does? I'm totally clueless when it comes to this, so please bear with me. If I want to redo my wall and floor tiles, is it normal for the contractor to quote me ONLY the labour charges (hacking, cement, laying new tiles..), and is this RM4,100 and RM4,300 the labour charges, or do you think this includes the new tiles?
I got this quotation from the contractor through an ID (who emailed it to me), and I've not gotten a reply from her about my above queries yet. Just wanted to some advice from people who are well-versed in this.
I would also like to obtain some recommendations on good bathroom contractors from you guys who've been through this (and survived haha!).. I need another quotation to make a comparison with this one that I got. Or... how many quotations does one need actually huh? Please drop me a note. Thanks. - Kel.
Added on August 12, 2011, 5:29 pmby the way, got one contractor even better. He told me no need to do water proofing. I was like 'WHAT REALLY?'
he said if cement break means leak. water proof also no use. If cement no break, that means no leak. So water proofing is actually useless.
Professionals out there..is that right????
This post has been edited by @Adele: Aug 12 2011, 05:29 PM
Aug 12 2011, 05:28 PM

Quote
0.0207sec
0.62
7 queries
GZIP Disabled