Hi, anyone know is the Phase 3 over the expected complete date?
If so any compensation for that? As I know the phase 2 is over also...
Platinum Victory Lake View City Phase 3
Platinum Victory Lake View City Phase 3
|
|
Feb 27 2011, 12:11 AM
Return to original view | Post
#1
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
Hi, anyone know is the Phase 3 over the expected complete date?
If so any compensation for that? As I know the phase 2 is over also... |
|
|
|
|
|
Apr 23 2011, 11:48 PM
Return to original view | Post
#2
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
I wonder is there any overbridge will build infront of jln genting kelang there coz i saw there is a bridge build just between pv13 and columbia hospital.. which do u guys think really needed? haha..
|
|
|
May 9 2011, 12:41 AM
Return to original view | Post
#3
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
I went to de site yesterday also. Looks like it only left the painting partially outside block A. So the phase 3 is changed to fully gated?
|
|
|
May 12 2011, 04:49 PM
Return to original view | Post
#4
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
I had the same impression on first sight too.. but it was changed after they paint de building mixture with white color...
|
|
|
Jun 20 2011, 11:54 AM
Return to original view | Post
#5
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
I am from block B level 12...
Thanks for all the updates.. |
|
|
Jun 29 2011, 06:16 PM
Return to original view | Post
#6
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
Planning to renovate by my contractor as well..
Anyone know what is the best way if wanna take a loan for the reno? Personal loan? Refinance? |
|
|
|
|
|
Jul 18 2011, 02:44 PM
Return to original view | Post
#7
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
|
|
|
Jul 18 2011, 03:11 PM
Return to original view | Post
#8
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
QUOTE(sony_user999 @ Jul 18 2011, 02:52 PM) anything else needed besides floor plan? Welcome.. I am planning to reno by a designer fren also.. i got to know that, when we got the key, then onli the contractor can go in for the measurement things, before than can start their attaching work. and, after that, when they will be going in for the renovation process, do they need to get any letter from management? and, any deposit or no return payment we need to pay management for that? william2014, thanks for the floor plan. thanks. And now i m jst waiting for de key to make sure all measurement is correct for reno planning.. Hope to hear more from others for the procedure for own reno also.. |
|
|
Jul 19 2011, 03:42 PM
Return to original view | Post
#9
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
For my opinion, the first level of security still the most important... is very depends on guard house there got doing their job well anot.. the lift jst de bonus feature for me..
One thing i totally agree with sony_user is to form a group among tenant.. not only for complaining but for info sharing as well... |
|
|
Jul 26 2011, 09:13 PM
Return to original view | Post
#10
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
Hi guys, jst bac from kk for holiday..
Took sometime to finish reading all posts also.. Anyway, I m from blok b level 12 |
|
|
Aug 1 2011, 11:05 PM
Return to original view | Post
#11
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
QUOTE(novabankinghall @ Aug 1 2011, 06:43 PM) Updated List of Owners 1 August 2011 william2014 from Block B level 12.. thx((Block A)) meto, Block A, Level 23a Steve Ng, Block A, Level 21 Odinn, Block A, Level 19 ROBINHAR, Block A, Level 19 peterchai288, Block A, Level 13a Dyensem, Block A, level 13 cs1123, Block A, Level 13 novabankinghall, Block A, Level 9 Beeeeee, Block A, Level 8 keith5988, Block A, Level 8 quezone, Block A, Level 6 ((Block B)) nakashimakazuma, Block B, Level 23A CHL, Block A, Lever 17 esjates, Block B, Level 16 hazwanh, Block B, Level 13a Coloring Life, Block B, Level 10 sony_user999, Block B, Level 9 m fairuz, Block B, Level 8 ellena, Block B, Level 7 Updated, those that i missed out please let me know. Thanks. Well to think positive, this month is not a good month to renovate/move in also... u know... 7th Chinese lunar month. |
|
|
Aug 3 2011, 04:42 PM
Return to original view | Post
#12
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
QUOTE(cutealex @ Aug 3 2011, 12:24 PM) i just hope the Tesco can be stick to Setapak, resume work and Open Soon...this will definately boost up PV10,PV13 value... The construction doing beside PV13 is phase 4&5 r?Phase 4 & 5 is coming...be ready to be crow and traffic jam..we all share the same entry... |
|
|
Aug 23 2011, 07:43 PM
Return to original view | Post
#13
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
Great~
|
|
|
Aug 24 2011, 07:20 PM
Return to original view | Post
#14
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
Called for appointment but unfortunately Pv still waiting de settlement from my bank.. So far only Maybank has settled..
Besides any photo share for de show unit? |
|
|
Sep 21 2011, 10:36 AM
Return to original view | Post
#15
|
![]()
Junior Member
19 posts Joined: Sep 2006 |
QUOTE(nakashimakazuma @ Sep 20 2011, 11:04 AM) i got the price for the tinting already I thought the guide book stated not allow to make any tinted on all the window glasses?anyone who interested can pm me basically tinting area: 1. master bedroom 2. living area 3. bedroom 2 4. bedroom 3 Note: this is for those 1313 unit |
| Change to: | 0.0324sec