QUOTE(winterad99 @ Nov 16 2011, 09:34 AM)
One month build 2 levels of building structure is very common according to my construction fren...  he has 8 years experience in building residential/high rise...
*
its actually depend on the layout design ...if all typical floor then should be fast..like PV one, all typical then very fast..
if the design change on the certain floor, the floor may need at least 3 week to complete as the steel formwork might need some modification to cater the new layout..
so to predict the compltion date, normally is 6 month after the tower crane take down..
i guess this project 1.5 years to go