QUOTE(superpigchan @ Jan 3 2013, 02:16 PM)
Just called to Empire office, and the staff told me that empire damansara will be handed over within this 2 months....r they really ready?
*
confirmed. my friend just letter ask for the delivery unit to him. rclxms.gif
kinx
post Feb 4 2013, 05:24 PM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
QUOTE(Lyner88 @ Feb 4 2013, 12:22 PM)
Dear all SOHO 2 buyer,

I think you guys received letter of handover already...

Did you notice that in the letter it mentioned that the CCC is still pending? Can they ask us to accept the delivery of VP when the CCC is still pending?
*
yes. i already asked the Lawyer. they can do it with VP. so which mean we got the key but can not move in and paid the money in advance sad.gif

the completion based on the "Unit" not the "whole" building.

kinx
post Feb 4 2013, 05:30 PM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
Chartered Architecture "stamp" and "Sign" this as completed.... remember... "completed" only relate to your unit but not whole buidling.


Few SOHO 2 internal photos.. unable to inspect the Unit.


Main Entrance
Attached Image



Lift ( total 6, 3 one side)
Attached Image



car park.
Attached Image



kinx
post Feb 4 2013, 06:03 PM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
QUOTE(Lcsx @ Feb 4 2013, 05:38 PM)
Ok seems like they do some design for the hallways. I had some concern on the walkway design being to dull and boring initially.
*
might be. the walkway in between lift is quite narrow.... sad.gif
kinx
post Feb 5 2013, 09:57 AM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
anyone go make payment today?

kinx
post Feb 6 2013, 10:37 AM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
QUOTE(1lima @ Feb 5 2013, 07:14 PM)
I am not sure why ED stuff is discussed here but I guess it is related to the same developer.

As to the VP of ED in particular Soho 2, I find it to be a very sloppy way to do the handover.  Technically, they can say that the unit is ready but the surrounding environment have not met the safety and health aspect as far as one can see from the visit there.  That is to say, the unit is ready, but it is not safe to even get there.  Debris can be found over the place and construction is still ongoing in a some ways.  For the architect to sign off the VP stage, I think there he has some explanation to do.

To Empire, the developer, this would present an opportunity to avoid the late delivery penalty as it is about 36 months from date of SPA.

Another observation, is that the units though fully furnished are not furnished yet.  Buyers need to coordinate with multiple parties such as TV and Minibar (with an electrical shop), Air con with someone else after VP and god knows whom for the curtains etc etc........

I know many buyers are not too happy over this matter. 

Good luck!!
*
i already checked with the Lawyer... saying VP based on the "unit" we purchase. by law VP is not related to the main entrace (i wonder how the Architect can stamp and sign off as completed). debris everywhere, Huge steel still can see inside the main entrance which is not cover at all.

for me also same thoughts.. they rushing for the 36 months penalty. but i go argue with this, they just smile, and in S&P stated they have the right to issue the VP. question back to the Architect, how they sign off with such kind of condition in the common areas.

as latest information, SOHO 1 purchaser might get the reimbursement due to the late delivery . as Master approval plan. the unit must completed on 22nd Feb 2013 (send out VP with approve from Architect)


yesterday, site survey, all mattress and sofa already moving in for SOHO 2. brand: GOOD NITE. light green colour for sofa. TV and Fridge need to collect after the settle all the payment by voucher (ESH electrical shop), hearding is the LCD 32inch sharp tv.

kinx
post Feb 6 2013, 01:26 PM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
QUOTE(Lyner88 @ Feb 6 2013, 11:44 AM)
hi all buyers,

So what do you guys plan to do?

Just proceed to pay the balance amount and get the keys?

Or you guys will appeal for it by write in to Empire office?
*
I already make the payment. inspection on 26th Feb.

they very confident can get the CCC on end of Feb. hmm.gif

kinx
post Feb 6 2013, 09:32 PM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
site survey.


here's the Mattress for the units. Brand.."GOOD NITE", sofa didnt take photo..as light green color.


note: mattress come with the Bed frame, quality not bad (black color)

Attached Image


Outside.




kinx
post Feb 6 2013, 09:33 PM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
main entrance.. still with HUGE STEEL in it... how the architect approved it? hmm.gif

Attached Image
kinx
post Feb 7 2013, 05:55 AM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
QUOTE(1lima @ Feb 6 2013, 11:18 PM)
Architect got balls mah!!! But then again the first VP inspection is 25 Feb, more than a month from their letter dated 20 Jan.  Really con buyers of more than a month out of 6 months defect liability.
*
But the today photo with paint[cool.gif on it already. last week this huge steel still without any paint on it. you can check on the previous thread. i think they working on it now.
kinx
post Feb 14 2013, 03:20 PM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
Aircond is not installed yet. need to contact the agent to install after clear the payment. confirmed 32 inch Sharp TV and one Sharp Mini fridge.
kinx
post Feb 14 2013, 06:37 PM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
This is the given free TV (32 inch) and fridge ..i surprise the fridge is larger than my expectation... rclxms.gif


Attached Image

Attached Image
kinx
post Feb 24 2013, 01:48 AM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
QUOTE(alextong99 @ Feb 21 2013, 11:27 PM)
Dear Owner and Buyer,
  Am Negotiator From Tech Real Estate (e31343) , Am handling a number of unit for Empire Damansara From Block A Hotel Office Suite To Block F Retail Lot Unit,

  Buyer can Choice a unit from Me from east to west or high to low floor unit. will giving actual unit information to u than u wont buy a wrong unit  to stay or invest cool2.gif  cool2.gif  cool2.gif

  For those owner wan to let go their unit can pm me or drop me a call for ur unit number. am no need other doc, just unit number than i can try to propose to my potential buyer. Will Try my best to get you a good tenant or right buyer .
some spy photo from soho 2

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image

user posted image
*
Thx for the spy photos.. hmm...can share mezzanine photos?
kinx
post Feb 24 2013, 10:39 PM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
tomorrow who going for first batch join inspection..
kinx
post Feb 25 2013, 12:26 AM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
QUOTE(superpigchan @ Feb 24 2013, 11:25 PM)
Me...afternoon section...excited....
*
take some photos and share it over here smile.gif


kinx
post Feb 25 2013, 12:26 AM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
QUOTE(superpigchan @ Feb 24 2013, 11:25 PM)
Me...afternoon section...excited....
*
which floor you bought? we neighbour rclxms.gif
kinx
post Feb 25 2013, 06:52 PM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
Heard the packing rental there not cheap.... Rm150 per month?
kinx
post Feb 26 2013, 04:39 PM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
just back from the Empire Damansara SOHO 2 VP.

summary: workmanship not really impressive. cry.gif A lot defects need to be fixed. overall i like the Toilet at mezzanine floor.

and i like the sharing lobby of odd and even floor. there is small hanging around area. you need the access card to access your floor only. at floor 28,29,30 confirmed with a Skybar where renovation in progress.

share some pics here.


Attached Image

Attached Image

Attached Image

Attached Image

Attached Image

Attached Image

Attached Image

[attachmentid=3321964]

Attached Image

[attachmentid=3321966]

[attachmentid=3321966]

Attached Image

Attached Image

Attached Image

Attached Image

Attached Image

Attached Image

Attached Image

Attached Image

This post has been edited by kinx: Feb 26 2013, 04:44 PM


Attached thumbnail(s)
Attached Image Attached Image
kinx
post Feb 26 2013, 09:29 PM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
share one more pic for Empire City... current construction..


Attached Image


Attached Image


kinx
post Feb 26 2013, 10:11 PM

Getting Started
**
Junior Member
289 posts

Joined: Jan 2003
From: U.S.A
QUOTE(RedDevil32 @ Feb 26 2013, 10:01 PM)
I just received a call from my bank, telling me that there is complication for my loan.They telling me, that ED is under commercial title, and my loan is for residential title.

I already sign off the office letter months ago. Now they ask me to resubmit in the document because commercial title have different document and maximum loan only 80%?
*
in you case most likely you need to resubmit your document or change. commercial title is only allow loan up to 85%.


you didnt check document during the purchase is under commercial title as well?