QUOTE(Alan Soo @ Jan 5 2010, 01:31 PM)
in klang valley my contractor quote me RM2.40 per sqft, L - Box (450mm + 300mm) RM 18 per foot run, it iz reasonable?
Is it including painting? I did mine for RM2 flat per sq ft. L Box is RM6 per foot run. Should get other quotes if you have the time.
Jan 7 2010, 09:20 PM

Quote
0.0142sec
0.86
6 queries
GZIP Disabled