Hmm...the basic stages should be somewhat like these:
Foundation Stage - This includes excavation, footings, foundation walls (or slab), waterproofing, backfill and compaction, and underground plumbing.
Framing Stage - This includes wood or steel framing, exterior wall and roof sheathing, exterior trim and siding (and/or stucco/brick), windows and exterior doors, and roofing.
Rough Plumbing, Mechanical, Electrical Stage - This includes water and waste/vent piping, plus setting of the water heater; ductwork, venting and furnace installation; wiring and electrical panel installation.
Insulation and Drywall Stage - This includes wall insulation, (but not attic insulation at this time), drywall installation, tape and texture.
Paint, Trim, Finishes Stage - This includes finished flooring, wall tile, mirrors, final electrical (including fixtures), final plumbing (including fixtures), and final mechanical.
Think our home is roughly between 3rd and 4th....
Slow Slow for better quality