Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

Investment Atmosfera Condominium, Puchong Jaya

views
     
calcom21
post Sep 13 2009, 12:44 PM

Getting Started
**
Junior Member
123 posts

Joined: May 2006
Hi,
Anyone planning to let go of their unit? I'm planning to get a small 1,282sq unit. Serious party here. PM me
calcom21
post Sep 18 2009, 10:03 PM

Getting Started
**
Junior Member
123 posts

Joined: May 2006
HI All, Guess what last saturday i went to Giant in Damansara and met KIM and introduced the condo to me and told me 90+% had been sold and lucky got 1 unit in block 1 left. Asked and said some buyer bank not approve and so i was quite impressed with the design and the facilities. Asked for the showroom and supposed to go in that day but decided to go the next day. When i went there, greeted by the same agent but told me the one sold alr yesterday. Left block B 1,282sq at price RM330k with the balcony blocked by opposite unit. Then i felt wasted as i think block 1 is cheaper and balcony not blocked. Felt regreted but wanted to get the other one. Suddenly monday the agent called me and said someone release their unit for resale so i quickly booked it in. Now waiting for my loan approval. Any bros know which bank provide the best rates at 90% of RM300k? Currently he said RHB is the best at BLR-2.2% with zero entry costs. I heard ocbc rates is cheap usil MLR but OCBC only max 80%. So happy to booked this unit now wanted to look for cheapest rates in town. Any bros wanna share with me their banker?

calcom21
post Feb 21 2010, 10:54 AM

Getting Started
**
Junior Member
123 posts

Joined: May 2006
QUOTE(Chester @ Feb 15 2010, 09:57 AM)
dang, if i know this will sell like hot cake, would have booked a unit when the sales approach me last timee...sad.gif
*
You regretted because you like it or because it sold like hot cakes? tongue.gif
calcom21
post Oct 9 2010, 09:01 PM

Getting Started
**
Junior Member
123 posts

Joined: May 2006
Anyone know whether the price in Atmosfera had appreciate or still remain the same? Heard property prices in Malaysia had gone up...
calcom21
post Apr 26 2012, 01:42 PM

Getting Started
**
Junior Member
123 posts

Joined: May 2006
So far heard from agent RM360-RM370
calcom21
post May 27 2012, 08:25 AM

Getting Started
**
Junior Member
123 posts

Joined: May 2006
QUOTE(yunashiwa @ May 25 2012, 10:53 AM)
Hi Falangkei. I've read your comments on the defects in your atmosfera unit. I've got the same issue if not more!

Gotta say that I'm quite disappointed with the finishing touches. My unit didn't even have the main door installed yet!! I don't understand how they can get clearance from government to release the unit to us buyers.

The unit is in a total mess right now. They gave me the whole bunch of keys to my unit. But I need to use NONE of them to go inside my unit as there is no door! The reason they give me is because Bomba request that they change the door to fire rated door for corner units cause the units are located further away from the lifts. Ok. But why cant they do it before giving us the permission to get the keys? I've paid everything in full in order to get the keys! But unfortunely I can't start installing lights or fans and air cons because there's no door to my unit. Who's gonna be responsible if things are stolen from my unit?

I've had lots of a issues with the finishing touches. When I said lots I mean LOTS!! I've counted to at least 200+ wall defects, ie. holes, cracks, unpaint, rough surface, etc. they took me a whole day to mark them all! There are a lot of unfilled gaps in between tiles. Especially on the edges, ie. the link from wall to floor. Some of the window railings are rotted. There are huge gaps on closed room doors, big enough for an iguana to squeeze through, (exaggerate a bit la). And the whole unit is super dirty. Windows are covered in splashed paints, paints all over the tiles, dripping down from the wall i supposed. I mean, arent they suppose to give us a FIT to stay unit? Who's buying a construction site to stay? But Man.. I really have no idea when can I "settle" all those before I can start renovating/installing lightings.

The management told me that they need AT LEAST another 2 weeks to get the door installed. And from then AT LEAST another month to look into all the defects I mentioned. Read carefully, AT LEAST... According to the man in charge, I don't know what he does but I know we are suppose to submit the defect list to him, he's got an office at the ground floor of the Kondo in block A. He also told me that it's better for me to submit the defect list after they've install the door. But when I asked him yesterday about the time they need once I submit the defect list to get the things done, he said if I submitted yesterday I'll be 56th on the waiting list. 56th??!! I don't think they can kaotim a unit in a day. So for sure I won't get the defects ratified in a month! That's for sure. And if I submit the defect list after the door is installed, I would be what? 356th on the waiting list? I mean come on!!

How can you collect money from me and telling me that the unit is FIT to occupy? Make no sense at all man.

Guys whoever you are. What do you suggest me to do? I just want to get the things done and move on! Time is essence. No point complain here and there and get no further from the problem I already have.

Gotta say, disappointing. I really do. We are paying good money for things like that..

P/S: I noticed that some of the room doors have these weird holes on the side. I guess they accidentally drill the wholes on the wrong side of the door and the just simply amend it by filling the holes and painted it to cover up. Should I request to replace the doors or is it normal to do that way? Cause the last time I check a door can cost a few hundreds. I mean I've already paid so much for the Kondo. Takkan I wanna buy some defect??

Gosh. The more I type the the more fire I get.
*


Bro, yes indeed there is a lot of defects. But some of it is not true. Installation of the fire rated door, yes.. probably 1-2 weeks time. Defect AT LEAST 1 month? no way... do check on your s&p. Max they need to rectified within 1 month. not at least. it's from the date you submit your defect checklist. but if you got time to go check it out regularly.. as they might hold it till a week or so then start fixing ur parts and u dowan them to fix it "cing cai" for you...


 

Change to:
| Lo-Fi Version
0.0244sec    0.25    7 queries    GZIP Disabled
Time is now: 3rd December 2025 - 04:50 PM