Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed

Outline · [ Standard ] · Linear+

 Amansiara @ Jalan Ipoh, Selayang v2, congrats to P2 , P3 owners VP !!!!!

views
     
kpdj
post May 22 2009, 01:08 PM

New Member
*
Junior Member
5 posts

Joined: Feb 2009


Hey! how come he didn't reply on the staircase problem

kpdj
post Jul 14 2009, 11:04 AM

New Member
*
Junior Member
5 posts

Joined: Feb 2009


Shafary,

V really appreciate your efforts. Very glad to have a neighbour like you. Bravo!

Thanks for all the planning.

:clap:
kpdj
post Jul 16 2009, 01:53 PM

New Member
*
Junior Member
5 posts

Joined: Feb 2009


I just called  leadmont ofc they replied ph 1 still pending for syabas approval in order to onbtain cf.
kpdj
post Aug 13 2009, 11:53 AM

New Member
*
Junior Member
5 posts

Joined: Feb 2009


QUOTE(senSual @ Aug 12 2009, 12:25 PM)
Hi Sharin,

My husband and I will be there. thanks!
*

Added on August 13, 2009, 12:35 pm
QUOTE(Siara @ Aug 12 2009, 12:42 PM)
Congratulation to Phase 1 owers for getting the CF after a long wait.  Did Level 1, 2 and Level 3 owers notice that their wall at the Master bathroom and the bathroom at the hall (a wooden square above the bathroom door). It looks like the wall is the ceiling board in between the wooden square. As per SnP second last page it is stated:

SPECIFICATION

STRUCTURE                   -     Reinforced concrete frame
WALL                             -     Masonry bricks/Reinforced concrete

WALL FINISHES

External wall                   -    Plaster with paint
Internal wall                    -   Plaster with paint

The point here is, it is not built to Specification as per SnP. Wall should be Masonry  bricks and Plaster with paint but not the wall at the bathroom wall above the bathroom door. The wall above the bathroom door is ceiling board and painted no plaster as stated in the SnP
*

Added on August 13, 2009, 12:36 pm
QUOTE(Siara @ Aug 12 2009, 12:42 PM)
Congratulation to Phase 1 owers for getting the CF after a long wait.  Did Level 1, 2 and Level 3 owers notice that their wall at the Master bathroom and the bathroom at the hall (a wooden square above the bathroom door). It looks like the wall is the ceiling board in between the wooden square. As per SnP second last page it is stated:

SPECIFICATION

STRUCTURE                   -     Reinforced concrete frame
WALL                             -     Masonry bricks/Reinforced concrete

WALL FINISHES

External wall                   -    Plaster with paint
Internal wall                    -   Plaster with paint

The point here is, it is not built to Specification as per SnP. Wall should be Masonry  bricks and Plaster with paint but not the wall at the bathroom wall above the bathroom door. The wall above the bathroom door is ceiling board and painted no plaster as stated in the SnP
*

Added on August 13, 2009, 12:37 pmSINCE V HV SUCH A LONG LIST OF DEFECTS, DO U THK OUR S&P LAWYER CAN HELP???

This post has been edited by kpdj: Aug 13 2009, 12:37 PM
kpdj
post Sep 30 2009, 02:25 PM

New Member
*
Junior Member
5 posts

Joined: Feb 2009


QUOTE(plateau @ Sep 30 2009, 12:07 PM)
Pasangan baru berkahwin looking for a place to rent in amansiara. Semi furnished (aircond, kitchen). Please pm me to quote me best price pls smile.gif
*
Hi,

Rumah i end lot, saya tengah cari tenant berminat untuk sewa le. Boleh bagi no hp i call u.