Hey! how come he didn't reply on the staircase problem
Amansiara @ Jalan Ipoh, Selayang v2, congrats to P2 , P3 owners VP !!!!!
Amansiara @ Jalan Ipoh, Selayang v2, congrats to P2 , P3 owners VP !!!!!
|
|
May 22 2009, 01:08 PM
Return to original view | Post
#1
|
![]()
Junior Member
5 posts Joined: Feb 2009 |
Hey! how come he didn't reply on the staircase problem
|
|
|
|
|
|
Jul 14 2009, 11:04 AM
Return to original view | Post
#2
|
![]()
Junior Member
5 posts Joined: Feb 2009 |
Shafary,
V really appreciate your efforts. Very glad to have a neighbour like you. Bravo! Thanks for all the planning. :clap: |
|
|
Jul 16 2009, 01:53 PM
Return to original view | Post
#3
|
![]()
Junior Member
5 posts Joined: Feb 2009 |
I just called leadmont ofc they replied ph 1 still pending for syabas approval in order to onbtain cf.
|
|
|
Aug 13 2009, 11:53 AM
Return to original view | Post
#4
|
![]()
Junior Member
5 posts Joined: Feb 2009 |
QUOTE(senSual @ Aug 12 2009, 12:25 PM) Added on August 13, 2009, 12:35 pm QUOTE(Siara @ Aug 12 2009, 12:42 PM) Congratulation to Phase 1 owers for getting the CF after a long wait. Did Level 1, 2 and Level 3 owers notice that their wall at the Master bathroom and the bathroom at the hall (a wooden square above the bathroom door). It looks like the wall is the ceiling board in between the wooden square. As per SnP second last page it is stated: SPECIFICATION STRUCTURE - Reinforced concrete frame WALL - Masonry bricks/Reinforced concrete WALL FINISHES External wall - Plaster with paint Internal wall - Plaster with paint The point here is, it is not built to Specification as per SnP. Wall should be Masonry bricks and Plaster with paint but not the wall at the bathroom wall above the bathroom door. The wall above the bathroom door is ceiling board and painted no plaster as stated in the SnP Added on August 13, 2009, 12:36 pm QUOTE(Siara @ Aug 12 2009, 12:42 PM) Congratulation to Phase 1 owers for getting the CF after a long wait. Did Level 1, 2 and Level 3 owers notice that their wall at the Master bathroom and the bathroom at the hall (a wooden square above the bathroom door). It looks like the wall is the ceiling board in between the wooden square. As per SnP second last page it is stated: SPECIFICATION STRUCTURE - Reinforced concrete frame WALL - Masonry bricks/Reinforced concrete WALL FINISHES External wall - Plaster with paint Internal wall - Plaster with paint The point here is, it is not built to Specification as per SnP. Wall should be Masonry bricks and Plaster with paint but not the wall at the bathroom wall above the bathroom door. The wall above the bathroom door is ceiling board and painted no plaster as stated in the SnP Added on August 13, 2009, 12:37 pmSINCE V HV SUCH A LONG LIST OF DEFECTS, DO U THK OUR S&P LAWYER CAN HELP??? This post has been edited by kpdj: Aug 13 2009, 12:37 PM |
|
|
Sep 30 2009, 02:25 PM
Return to original view | Post
#5
|
![]()
Junior Member
5 posts Joined: Feb 2009 |
|
|
Topic ClosedOptions
|
| Change to: | 0.0428sec
0.58
7 queries
GZIP Disabled
Time is now: 18th December 2025 - 03:48 PM |