Single's Club V142, GONG HEI GONG HEI ! =p
Single's Club V142, GONG HEI GONG HEI ! =p
|
|
Jan 23 2009, 12:39 PM
Return to original view | Post
#1
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
|
|
|
Jan 23 2009, 01:03 PM
Return to original view | Post
#2
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Jan 23 2009, 03:17 PM
Return to original view | Post
#3
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
![]() |
|
|
Jan 23 2009, 03:27 PM
Return to original view | Post
#4
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(dEvILrOx @ Jan 23 2009, 03:21 PM) The one on that photo, is not KTM, but from Ireland............However, the future train that will arrive next year, will be very similar to this and built in South Korea.... Wireless internet maybe available according from news report and top speed, 140 km/h |
|
|
Jan 23 2009, 03:33 PM
Return to original view | Post
#5
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(^Hobbes^ @ Jan 23 2009, 03:29 PM) Tak mungkin lah.........our population density is not high like in Japan or China, building MAGLEV will be instant white elephant from the start...We expect that in future, KL to Butterworth will be 3 hours... QUOTE(dEvILrOx @ Jan 23 2009, 03:30 PM) O.o next yr ? so long more ~ aih ~ Of course lah, building train is not like building car...current condition of the train is long distant short distant semua panas panas belaka got LCD TV also like no LCD TV like dat ... sometimes working sometimes not working the cable lose adi From my experience, the LCD works, but it showed Speedy Gonzales and Garfield The Movie.... QUOTE(peinsama @ Jan 23 2009, 03:30 PM) Transport minister, i actually like it though... |
|
|
Jan 23 2009, 03:45 PM
Return to original view | Post
#6
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(^Hobbes^ @ Jan 23 2009, 03:37 PM) Hard to say, from an economic sense, there is demand MAGLEV memang cannot build eh......expensive and incompitable with any of our existing rail system, which makes connectivity is WTF.....Altho ROI would be slow, if funded by the G, shouldnt be a problem I'd rather have a public oriented white elephant than personal interest oriented white elephant Macam 100s or possible 1000s of new buses being dumped some where Itu bas lama? From Intrakota that one ah.... It is a waste to dump those, afterall, actually, not all of those buses are being dumped, as seen from my observation....there are a few Intrakota buses being refurbished to be on service... Photos from me » Click to show Spoiler - click again to hide... « |
|
|
|
|
|
Jan 23 2009, 03:52 PM
Return to original view | Post
#7
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(^Hobbes^ @ Jan 23 2009, 03:48 PM) Connectivity already WTF in Msia That is in Shanghai, which happens to be has high population density, busier airport, higher population......Shanghai muncipality alone got 16.7 million peoples, not to mention nearby cities such as Hangzhou....We got LRT and then we got KTM and then we got another one that runs in KL alone forgot what name Some are some not but from leaked photos i saw alot still laying waste there China's Maglev can break even with 7k passenger a day If maglev is so good, then why the Chinese opt for use standard high speed rail instead of maglev, hehe.... LRT for urban use, KTM is here since the British era and Komuter is more for suburban/regional rail..........that is perfectly fine... Only that, integration is WTF.....Monorail to KL Sentral, need to walk damn far....Bukit Nanas to Dang Wangi also WTF.... |
|
|
Jan 23 2009, 04:03 PM
Return to original view | Post
#8
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(^Hobbes^ @ Jan 23 2009, 03:57 PM) Yes integration and i dont understand why we need 3 different types under 3 different company KTM is heavy rail, metre gauge Just use one for the sake of simplicity and maintain them Rapid KL is light rail Monorail, self explanatory ERL, heavy rail, standard gauge Bangkok got BTS and Bangkok Metro Tokyo got JR East, Keikyu, Keisei, Tokyo Metro, Tokyo Monorail, Tokyu and others.. Different operators or technologies is not the question, because each technology is suited for different requirement and circumstances, but more on the fault of planning........in Singapore you got LTA (Land Transport Authority) to regulate public transport and oversee construction of stations...not the SMRT ot SBS themselves, but LTA is the one who plan the station, at the end, got full integration lah.... In Mareshia, there is no single body for public transport, so at the end, everything also like spaghetti.... This post has been edited by Kampung2005: Jan 23 2009, 04:03 PM |
|
|
Jan 23 2009, 04:10 PM
Return to original view | Post
#9
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(^Hobbes^ @ Jan 23 2009, 04:04 PM) Oh yes A good chance for males to accompany females though...In lieu of our green policy we wont be supplying any paper bags or plastic bags, any one who throws up mid flight will be thrown out of the plane automatically We'll be reaching our destination in 2330, but should we need to throw any one out mid flight, we'll definitely need to revise our ETA time If can please swallow it back to avoid being thrown out of the plane Thank you Added on January 23, 2009, 4:06 pm Macam Rojakkkkkkkkkkk more like it If you need to have seperate technology seperate operators, at least make them comply with certain requirement, i.e. not too far from each other Edit: I've given up on public transport in Mareshiaaaaaa, no single body for public transport still tolerable, but security at public transport terminals is paltry |
|
|
Jan 23 2009, 04:12 PM
Return to original view | Post
#10
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Jan 23 2009, 04:17 PM
Return to original view | Post
#11
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Jan 23 2009, 04:27 PM
Return to original view | Post
#12
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Jan 23 2009, 04:33 PM
Return to original view | Post
#13
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(^Hobbes^ @ Jan 23 2009, 04:31 PM) Yes i agree, just kawan See first lah, for me..........now that she is my kawan, i am more than satisfied liao........i can consider my mission and objective in SC, one of that objectives, has been FULFILLEDBut like my point of view Coal driven trains > Electric driven trains > Magnetic driven trains U know how acquaintance can evolve over time QUOTE(Cheesenium @ Jan 23 2009, 04:31 PM) Who knows....hahaQUOTE(silverhawk @ Jan 23 2009, 04:31 PM) Yes, i have an outing with Jamien already.............few days ago... |
|
|
|
|
|
Jan 23 2009, 04:37 PM
Return to original view | Post
#14
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(^Hobbes^ @ Jan 23 2009, 04:36 PM) wahhh Haha, i don't know lah...mundane nyeee korek korek korek and at each progression we become more and more ferociousssssssssss like 8kmh achieved in 1804 from a steam driven train to 581 kmh achieved in 2003 on a maglev driven train But she did tarik my ear or hair that day....feel sakit lah |
|
|
Jan 23 2009, 04:40 PM
Return to original view | Post
#15
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(silverhawk @ Jan 23 2009, 04:37 PM) It was very nice in my opinion........i mean the outing, herself................the way she talks, looks pleasant to me and we had laughs most of the time...QUOTE(^Hobbes^ @ Jan 23 2009, 04:38 PM) yes yes yessss Er, Kampung will be "monk" for foreseeable future...soon it will be baby loco!!! Congrats on achieving what you wanted But please look forward to next achievement 1804 8kmh on steam driven and progres until 581 kmh So at each progression we consider ourselves achieving certain objectives |
|
|
Jan 23 2009, 04:42 PM
Return to original view | Post
#16
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(Fatimus @ Jan 23 2009, 04:39 PM) QUOTE(^Hobbes^ @ Jan 23 2009, 04:40 PM) Oh naisee It is not in the interest of Kampung to have girlfriend for now, but having a GF will spoil the megaprojects that Kampung is executing currently...Another progression Next time she tarik your hair You stroke her hair back Then you achieved another progression |
|
|
Jan 23 2009, 04:44 PM
Return to original view | Post
#17
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Jan 23 2009, 04:48 PM
Return to original view | Post
#18
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Jan 23 2009, 04:49 PM
Return to original view | Post
#19
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
|
|
|
Jan 23 2009, 04:52 PM
Return to original view | Post
#20
|
|
VIP
3,028 posts Joined: Feb 2005 From: 梅田,大阪 //Sabah |
QUOTE(^Hobbes^ @ Jan 23 2009, 04:48 PM) Oh megaprojects can waitt Megaprojects are:Finding a suitable partner may come only once in a lifetime Yes its the Omen!!! Wahhh when sien come here for entertainment? - Bridge strengthening project to Cheese-kun - Railway double tracking to Pein republic - Elevated expressways to Dupicalz - Elevated expressways to Hawkie This post has been edited by Kampung2005: Jan 23 2009, 04:52 PM |
|
Topic ClosedOptions
|
| Change to: | 0.0208sec
0.99
7 queries
GZIP Disabled
Time is now: 10th December 2025 - 12:18 PM |