Just picked up keys for Kayangan Puteri on behalf of my brother.
For anyone else picking up keys, make sure you get the contractor to turn on the water supply and check all the tap fittings in the toilets. The contractor guy was telling us that people usually only turn on the water supply when they are ready to move in. We wanted to check for leaks, so we insisted he turn them on.
As it turns out, most of the tap fittings were leaking. Their excuse is that they installed it when there was no water supply, so they couldn't test it for leaks. Apparently, water supply only connected this past Wednesday.
Also, no piping for Unifi (or any other brand) fibre cable to the linen room. They only connected phone line to the place where the ethernet cables come together. The brochure Key Feature states: Underground cabling and fibre optic infrastructures for high-speed Internet.
USJ Heights, Comments / Discussions
Jan 6 2012, 04:25 PM
Quote
0.0151sec
0.44
7 queries
GZIP Disabled