QUOTE(JustNobody @ Jan 14 2019, 08:34 PM)
Wiring not yet do. The wet work still havent completeRenovations 3-phase wiring
Renovations 3-phase wiring
|
|
Jan 15 2019, 07:45 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,594 posts Joined: Aug 2017 |
|
|
|
|
|
|
Jan 15 2019, 01:29 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
960 posts Joined: Jan 2003 |
just a question, must the internal (wiring from meter to DB and DB box re-wiring) work has to be started right after TNB done the external work(3 phase wiring pulled, change meter panel and meter) ?
Can it like once TNB done, then TNB connect back existing 1 phase internal wire, electricity resume as normal, until schedule another time with contractor to do internal work. |
|
|
Jan 15 2019, 03:04 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
6,914 posts Joined: Apr 2007 |
QUOTE(IceBikers @ Jan 15 2019, 01:29 PM) just a question, must the internal (wiring from meter to DB and DB box re-wiring) work has to be started right after TNB done the external work(3 phase wiring pulled, change meter panel and meter) ? Errr. Can it like once TNB done, then TNB connect back existing 1 phase internal wire, electricity resume as normal, until schedule another time with contractor to do internal work. The wiring from internal db to meter is not the responsibility of tnb. They can come and do the external part without any problem. If the contractor is licensed and accredited by tnb they might be able to open the wire clamps of the tnb meter to install two more wire from internal to meter to finish the 3 phase, then install new clamps with and report the number on the clamps to tnb. This you will have to make sure and ask tnb and the contractor properly or you might face problems in future....like tempering with meter. |
|
|
Jan 15 2019, 03:57 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
960 posts Joined: Jan 2003 |
QUOTE(slimey @ Jan 15 2019, 03:04 PM) Errr. I got this The wiring from internal db to meter is not the responsibility of tnb. They can come and do the external part without any problem. If the contractor is licensed and accredited by tnb they might be able to open the wire clamps of the tnb meter to install two more wire from internal to meter to finish the 3 phase, then install new clamps with and report the number on the clamps to tnb. This you will have to make sure and ask tnb and the contractor properly or you might face problems in future....like tempering with meter. the wires from meter (1 live 1 neutral) to internal DB is concealed --> require own assign electrician contractor to lay new wire from meter to internal DB and do the balancing. I have a house at hometown where I'm not always back. I am wondering, can I first apply arrange with TNB to do the external wiring first, including changing the panel n meter. TNB pull 3 wires (red, blue, yellow and 1 black neutral) to the meter, but only use one phase first with existing internal wire. the other 2 remain hanging uninstall. So I can arrange with own contractor to do the rest internal work (hack and lay new cable from meter to internal DB, on another schedule. |
|
|
Jan 15 2019, 05:40 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
6,914 posts Joined: Apr 2007 |
QUOTE(IceBikers @ Jan 15 2019, 03:57 PM) I got this What I am saying is this:the wires from meter (1 live 1 neutral) to internal DB is concealed --> require own assign electrician contractor to lay new wire from meter to internal DB and do the balancing. I have a house at hometown where I'm not always back. I am wondering, can I first apply arrange with TNB to do the external wiring first, including changing the panel n meter. TNB pull 3 wires (red, blue, yellow and 1 black neutral) to the meter, but only use one phase first with existing internal wire. the other 2 remain hanging uninstall. So I can arrange with own contractor to do the rest internal work (hack and lay new cable from meter to internal DB, on another schedule. The bottom part where the meter is attached to the electric cable has cover with anti temper wire clamps that has numbers attached to the wire clamps. That’s the part you need to clarify with your contractor and tnb. As any difference or evidence of tempering can and will be used against you. |
|
|
Jan 16 2019, 10:39 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
960 posts Joined: Jan 2003 |
ok , got it, thanks
|
|
|
|
|
|
Apr 9 2019, 03:18 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
974 posts Joined: Sep 2005 |
QUOTE(sonypshomer @ Jan 14 2019, 10:18 AM) TNB just did my 3 phase around RM2.5k bro, means in total 3.5K? What's included in the 3.5K ah? But i have to pay extra since i want my meter to be outside the gate and the cable pull directly from the post (not from neighbor) With waterproof housing and installation around RM1K Also which area are you at ah? |
|
|
Apr 9 2019, 03:20 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,594 posts Joined: Aug 2017 |
|
|
|
Apr 9 2019, 04:44 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
974 posts Joined: Sep 2005 |
|
|
|
Apr 10 2019, 12:43 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,594 posts Joined: Aug 2017 |
|
|
|
May 15 2019, 03:35 PM
Show posts by this member only | IPv6 | Post
#1011
|
![]() ![]()
Junior Member
246 posts Joined: Oct 2009 |
guys i have a burning question, if upgrade to 3 phase. how do u know if u will kena surcharge for not using enough electricity?
|
|
|
May 15 2019, 07:51 PM
|
![]() ![]() ![]()
Junior Member
454 posts Joined: Feb 2013 |
|
|
|
May 16 2019, 11:20 AM
Show posts by this member only | IPv6 | Post
#1013
|
![]() ![]()
Junior Member
246 posts Joined: Oct 2009 |
|
|
|
|
|
|
Aug 5 2019, 04:02 PM
|
![]()
Junior Member
35 posts Joined: Aug 2007 |
Hi I'm trying to upgrade my house to 3phase, however the pole is not in front of my house but opposite. So they are are suggesting me to add another pole infront of my house which I dislike.
I asked them for the price of laying the cable underneath the road. They quote me RM25k! Does it cost this much? |
|
|
Aug 6 2019, 10:52 PM
|
![]()
Junior Member
46 posts Joined: Nov 2012 |
QUOTE(PaterB @ Aug 5 2019, 04:02 PM) Hi I'm trying to upgrade my house to 3phase, however the pole is not in front of my house but opposite. So they are are suggesting me to add another pole infront of my house which I dislike. If the quotes and reply is from TNB , then it's the accurate price , if not, then try to take picture and go Tnb ask properly , where's your location actuallyI asked them for the price of laying the cable underneath the road. They quote me RM25k! Does it cost this much? |
|
|
Aug 29 2019, 01:05 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,921 posts Joined: Apr 2013 From: Petaling Jaya |
Sorry to hijack your thread. What are the steps to get the tnb contractors to install 3phase wiring from the pole to my clients house? Area is ttdi and the internal 3phase wiring is done previously by another contractor but my client didnt do it until I started work at their place and now they want 3phase wiring. And may I know roughly how much it will cost? Any number of tnb which I can call and ask? Thanks guys.
|
|
|
Aug 29 2019, 04:11 PM
Show posts by this member only | IPv6 | Post
#1017
|
![]() ![]()
Junior Member
246 posts Joined: Oct 2009 |
QUOTE(bobowyc @ Aug 29 2019, 01:05 PM) Sorry to hijack your thread. What are the steps to get the tnb contractors to install 3phase wiring from the pole to my clients house? Area is ttdi and the internal 3phase wiring is done previously by another contractor but my client didnt do it until I started work at their place and now they want 3phase wiring. And may I know roughly how much it will cost? Any number of tnb which I can call and ask? Thanks guys. where is your meter box located now?to apply for 3 phase - go to my tnb self service portal and register. apply from there to upgrade your power from single to 3 phase. submit docs via online process and select a tnb certified contractor. he will come and assess and do submission for you. pricing depends on tnb assessment. |
|
|
Aug 29 2019, 05:50 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,921 posts Joined: Apr 2013 From: Petaling Jaya |
QUOTE(littlewing @ Aug 29 2019, 04:11 PM) where is your meter box located now? Currently repositioned to outside. But I made a mistake of not calling them first... because now may need to hack for their wiring to be installed. to apply for 3 phase - go to my tnb self service portal and register. apply from there to upgrade your power from single to 3 phase. submit docs via online process and select a tnb certified contractor. he will come and assess and do submission for you. pricing depends on tnb assessment. |
|
|
Aug 29 2019, 11:27 PM
|
![]() ![]()
Junior Member
246 posts Joined: Oct 2009 |
QUOTE(bobowyc @ Aug 29 2019, 05:50 PM) Currently repositioned to outside. But I made a mistake of not calling them first... because now may need to hack for their wiring to be installed. Submission fee 600-1.5k (depending how much the runner wanna charge u) - suggest u call them up before choosing one Tnb Contribution fee- 1.7k (typically, unless special case) Deposit top up abt - 200 |
|
|
Aug 30 2019, 09:25 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,921 posts Joined: Apr 2013 From: Petaling Jaya |
QUOTE(littlewing @ Aug 29 2019, 11:27 PM) Submission fee 600-1.5k (depending how much the runner wanna charge u) - suggest u call them up before choosing one SUbmission fee if i do through website is direct with tnb right?Tnb Contribution fee- 1.7k (typically, unless special case) Deposit top up abt - 200 |
| Change to: | 0.0229sec
0.65
6 queries
GZIP Disabled
Time is now: 2nd December 2025 - 01:33 PM |