Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 ðŸ”¥ Penang Deputy CM 2 heated with contractor 🔥

views
     
Lobulan
post Yesterday, 07:20 AM

New Member
*
Junior Member
0 posts

Joined: Oct 2025
QUOTE(Penamer @ Dec 4 2025, 02:19 PM)
why use such a big construction crane block both lanes? don't have smaller ones, after all branches arent that heavy? plus cannot climb the tree to prune?
*
Let us from the construction sector brief you the basics, we don't just choose crane size based on how heavy the object we want to lift, but also the reach, although branch might be light as u said, if the reach is too far, you need a bigger crane for its boom length & lift capacity at certain stretch, refer the load chart.

user posted image
user posted image

This post has been edited by Lobulan: Yesterday, 07:24 AM

 

Change to:
| Lo-Fi Version
0.0123sec    0.26    6 queries    GZIP Disabled
Time is now: 6th December 2025 - 11:55 AM