QUOTE(spurswong @ Feb 15 2026, 11:10 AM)
Received my eMas 5 31st January, made my appointment with charger installers as soon as I could, installation date March 10th, loved the car but really more than 1 month lag time for charger to be installed? There must be a mechanism in place to book appointments with installers before delivery of car
Get outside wireman to install. Just show them the ST single line drawing. It contain all the specs required. Cost a lot less than rm1k.
If you're worried about warranty, new charger are around rm350-500 and can get 10m long cable. If salesman scare you about SIRIM and shit, their charger also no SIRIM
If they scare you about support and shit, ask them what's the lead time for repairs? Some I heard kena sidai for weeks.
For kampung use, get wireman to install 32A CEE Socket, still refer back ST Spec. Back to back should be around rm400 like that. You can plug your portable charger and charge at 7kW in middle of jungle. (in my case have to limit to 20A as the voltage sag too much till less than 200V left) This is how I live with EV in Sarawak, otherwise balik kampung trip is not possible.