cable car. who pay? cameron highland or federal?
Cameron Highlands residents say no to aerial tram
https://www.malaymail.com/news/malaysia/201...al-tram/1019103
There are no finalized cable car plans currently built or operating in Cameron Highlands, but a proposal from 2015 estimated a potential cost of RM550 million for an aerial tram network, although it was met with significant local opposition due to environmental concerns. The cost included ropeway technology, civil engineering, and construction for what was intended to be the longest aerial tram in the world.
This post has been edited by Phoenix_KL: Sep 13 2025, 01:27 PM
Surprised Cameron Highlands still
Sep 13 2025, 01:25 PM
Quote
0.0123sec
0.64
6 queries
GZIP Disabled