QUOTE(Sotsotzaii @ Mar 5 2025, 07:19 PM)
So basically after flooring is done, it's more advisable to paint first and then install lighting fixture last ?
I am doing reno as well and my planned sequence, after all the structural work, is always top to bottom:1) roof fixing and repair, include sky roof
2) wiring and piping
3) bathroom tiling
4) false ceiling
5) painting
6) flooring
7) lighting, wall switch n socket
8) cabinets n sliding doors
There are others minor stuff I am doing that may need to be squeezed in between, so need to spend time to coordinate
Mar 5 2025, 10:09 PM

Quote
0.0141sec
0.33
6 queries
GZIP Disabled