LRT3 scheduled to begin operation on Sept 30 -- MOT
Bernama
27/02/2025 15:50 MYT


KUALA LUMPUR: The Light Rail Transit Line 3 (LRT3) in the Klang Valley is scheduled to start operation on Sept 30, 2025, after the project's hand-over to Prasarana Malaysia Bhd by the turnkey contractor on July 31.

The Ministry of Transport, in a written response posted on the Parliament website on Wednesday, said that to date, the overall progress of the project, which spans from Bandar Utama to Johan Setia, has reached 98.16 per cent.

The ministry also mentioned that train operation tests without passengers will be conducted in two stages to ensure the LRT3 service is safe for users.

"These two tests cover compliance, durability, and safety of the rail system and standard operating procedures (SOPs). They involve a trial run (TR) that will be conducted concurrently with the fault free run (FFR) test by the project's main contractor, Setia Utama LRT3 Sdn Bhd," it said.

The test period is estimated to be 75 days, and the results of the FFR test will be evaluated by the Land Public Transport Agency (APAD) in terms of safety, standard compliance, and specific rail system guarantees," according to the MOT.

The ministry was replying to a question from Azli Yusof (PH-Shah Alam), who requested clarification on the current status of the LRT3 project, the duration of the trial run without passengers, and whether it is on target for full operation by the third quarter of 2025.

The MOT informed that the TR/FFR tests are expected to begin in mid-April and finish by the end of June 2025.
After the TR and FFR tests are completed and approved by APAD, a trial operation (TO) will be conducted by Rapid Rail Sdn Bhd as the licensed rail operator, with technical support from the main contractor.

"The estimated duration for the TO test is 60 days. The TO test is expected to begin in July and conclude by the end of August 2025," it said.
-- BERNAMA

Sekian. Sila bersurai secara aman dan teratur.
netcrawler
post Feb 28 2025, 12:39 PM

Regular
******
Senior Member
1,542 posts

Joined: Jan 2005
From: Seri Kembangan


This LRT should branch out to Setia alam, Alam Impian and Kota Kemuning. These few places are densely populated and make this line more profitable.
Seawater
post Feb 28 2025, 12:43 PM

New Member
*
Junior Member
10 posts

Joined: Feb 2023
Handover first then only talk. Nanti surprised delay again
Bull Poli
post Feb 28 2025, 12:44 PM

Getting Started
**
Junior Member
81 posts

Joined: Sep 2014
QUOTE(netcrawler @ Feb 28 2025, 12:39 PM)
This LRT should branch out to Setia alam, Alam Impian and Kota Kemuning. These few places are densely populated and make this line more profitable.
*
Public transport rarely is profitable. I don't think any lines on Malaysia makes profit. That's not the point of the line, it's to connect people to places and hopefully improve economic state of the surrounding areas.
MR_alien
post Feb 28 2025, 12:49 PM

Mr.Alien on the loss
*******
Senior Member
3,581 posts

Joined: Oct 2007
From: everywhere in sabah



QUOTE(Seawater @ Feb 28 2025, 12:43 PM)
Handover first then only talk. Nanti surprised delay again
*
let's hope they're competent....unlike "MAHB"
max_cavalera
post Feb 28 2025, 12:54 PM

rebirth
*******
Senior Member
5,614 posts

Joined: Jun 2006
From: Cyberjaya, Shah Alam, Ipoh



QUOTE(hotdayum @ Feb 28 2025, 01:36 PM)
Sos : News Link
Sekian. Sila bersurai secara aman dan teratur.
*
Fuuuuuu

Klang automatic become higher status city after this 😎😎
nearlee
post Feb 28 2025, 12:56 PM

Getting Started
**
Junior Member
105 posts

Joined: May 2009
From: palaoxko
>inb4 69 Fu / Loke 7 topkek
Optizorb
Nearlee

rollinginsodeep
post Feb 28 2025, 12:56 PM

Getting Started
**
Junior Member
77 posts

Joined: Apr 2022
who want to bet with me that it will be delayed again?

My bet is it will delayed to December 2025
TShotdayum
post Feb 28 2025, 12:59 PM

Getting Started
**
Junior Member
195 posts

Joined: Sep 2019


QUOTE(max_cavalera @ Feb 28 2025, 12:54 PM)
Fuuuuuu

Klang automatic become higher status city after this 😎😎
*
So Colombia become... Mexico?
max_cavalera
post Feb 28 2025, 01:04 PM

rebirth
*******
Senior Member
5,614 posts

Joined: Jun 2006
From: Cyberjaya, Shah Alam, Ipoh



QUOTE(hotdayum @ Feb 28 2025, 01:59 PM)
So Colombia become... Mexico?
*
Upgrade ler bekam Cyberpunk Klangmbia


max_cavalera
post Feb 28 2025, 01:07 PM

rebirth
*******
Senior Member
5,614 posts

Joined: Jun 2006
From: Cyberjaya, Shah Alam, Ipoh



QUOTE(netcrawler @ Feb 28 2025, 01:39 PM)
This LRT should branch out to Setia alam, Alam Impian and Kota Kemuning. These few places are densely populated and make this line more profitable.
*
Later pipur from thr migrate and stay in Klangmbia ler after lrt operational.

Like Sibehfarjaya. After they close down the bus station and mrt operational. The population increase rapidly. Jam some more during peak hours now.

 

Change to:
| Lo-Fi Version
0.0170sec    0.48    5 queries    GZIP Disabled
Time is now: 11th December 2025 - 12:04 AM