duck tape is enough
This post has been edited by WinkyJr: Nov 8 2024, 03:20 PM
Residensi Wilayah JSatin, Block C crack, structural failure
Residensi Wilayah JSatin, Block C crack, structural failure
|
|
Nov 8 2024, 03:19 PM
Return to original view | Post
#1
|
![]() ![]() ![]()
Junior Member
433 posts Joined: Jul 2010 |
duck tape is enough
This post has been edited by WinkyJr: Nov 8 2024, 03:20 PM |
|
|
Nov 8 2024, 03:28 PM
Return to original view | Post
#2
|
![]() ![]() ![]()
Junior Member
433 posts Joined: Jul 2010 |
QUOTE(Silfer @ Nov 8 2024, 03:01 PM) sounds good but even i not confident to stay after rectification. most proper and surekill to gain confident of customer and PR is demolish whole block and re-do. demo and redo the entire block? even if they've completed 20 or 30 floors? 😮that crack looks like structure failure on that part / section which could probably means the whole zone which was casted in that area got weak ass concrete (probably failed slump). i've always wondered when looking at those nearly completed high-rise, what if the first floor suddenly experienced a critical structural failure? better to abandon the project, patch up the issue, or redo the whole thing.. |
| Change to: | 0.0193sec
0.55
7 queries
GZIP Disabled
Time is now: 15th December 2025 - 05:37 PM |