Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Residensi Wilayah JSatin, Block C crack, structural failure

views
     
WinkyJr
post Nov 8 2024, 03:19 PM

Casual
***
Junior Member
433 posts

Joined: Jul 2010

duck tape is enough

This post has been edited by WinkyJr: Nov 8 2024, 03:20 PM
WinkyJr
post Nov 8 2024, 03:28 PM

Casual
***
Junior Member
433 posts

Joined: Jul 2010

QUOTE(Silfer @ Nov 8 2024, 03:01 PM)
sounds good but even i not confident to stay after rectification. most proper and surekill to gain confident of customer and PR is demolish whole block and re-do.
that crack looks like structure failure on that part / section which could probably means the whole zone which was casted in that area got weak ass concrete (probably failed slump).
*
demo and redo the entire block? even if they've completed 20 or 30 floors? 😮
i've always wondered when looking at those nearly completed high-rise, what if the first floor suddenly experienced a critical structural failure? better to abandon the project, patch up the issue, or redo the whole thing..

 

Change to:
| Lo-Fi Version
0.0193sec    0.55    7 queries    GZIP Disabled
Time is now: 15th December 2025 - 05:37 PM