Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Residensi Wilayah JSatin, Block C crack, structural failure

views
     
Virlution
post Nov 11 2024, 10:49 AM

Casual
***
Junior Member
483 posts

Joined: Jan 2010


this type of design, those buy facing inside and lower floors would not have much of a breeze
Virlution
post Nov 11 2024, 11:13 AM

Casual
***
Junior Member
483 posts

Joined: Jan 2010


QUOTE(desmond2020 @ Nov 11 2024, 10:59 AM)
You get swimming pool view weh
Bikini weh
Ohwai
*
not the usual tudung swimmers in tshirts and tracks??
Virlution
post Nov 11 2024, 02:28 PM

Casual
***
Junior Member
483 posts

Joined: Jan 2010


QUOTE(yuzhe28 @ Nov 11 2024, 01:07 PM)
Read my comment carefully bro. Im against this fella 200k rectification proposal without any ground investigation and throwing these rubbish proposal.

Its not as easy as any crackline and grouting.
*
they will dig and reinforce the foundation, then buy back certain units and install additional load bearing support bracing so the side will not buckle....

user posted image

those who get buy back will be lucky, those who did not might have to pray hard
Virlution
post Nov 11 2024, 02:40 PM

Casual
***
Junior Member
483 posts

Joined: Jan 2010


user posted image

Additional rebar to strengthen the load bearing structures.....
Virlution
post Nov 12 2024, 08:22 AM

Casual
***
Junior Member
483 posts

Joined: Jan 2010


QUOTE(BoomerangCircles @ Nov 11 2024, 04:56 PM)
lol… looks so logic.. but hell no.

This is totally different things. This is strengthen.
While the structure already broken. Only way is rebuild.
*
this is structural repair.
Virlution
post Nov 12 2024, 08:28 AM

Casual
***
Junior Member
483 posts

Joined: Jan 2010


QUOTE(Nanti Sekejap @ Nov 11 2024, 03:30 PM)
if rectify liddat local council also dare to issue cf/ccc, then the developer sure has to organise big big trick or treat haloween party to give big big candy, lol
*
not yet concrete, later concrete they will sell again, people will notice the bigger support pillar, it is in the contract clause that there might be small % in size difference, buyer's balls kena hold liao....


QUOTE(desmond2020 @ Nov 11 2024, 03:33 PM)
But they need to fix the failed foundation first
How to fix the failed pile?
*
foundation usually solid, but structure lain cerita, especially when they use chemical mix instead of full concrete and heavy rebar. hence the building crack when it lean one side
Virlution
post Nov 12 2024, 08:47 AM

Casual
***
Junior Member
483 posts

Joined: Jan 2010


QUOTE(fookie @ Nov 12 2024, 08:31 AM)
viral also no use la. google residensi hektar gombak. i'm quite sure it's 100% bumi buyer from the comments in social media.

government also don't wanna help blush.gif
*
rumahwip no one care??

https://www.bharian.com.my/berita/nasional/...google_vignette
Virlution
post Nov 12 2024, 12:22 PM

Casual
***
Junior Member
483 posts

Joined: Jan 2010


QUOTE(ameer88 @ Nov 12 2024, 12:03 PM)
the picture refers to strengthening work to strengthen old building or to add more strength to new additional floors.

how about structure that has sunk in by 100-200mm or more?

we are talking about 44floors with massive weight to it.  ohmy.gif
*
read this, someone also mention about the issue is cause by the structure not foundation sinking.

Foundation sinking, the whole site will need to be demolished, cause you cant rescue just one part

https://forum.lowyat.net/index.php?showtopi...ost&p=110764436

 

Change to:
| Lo-Fi Version
0.0160sec    0.86    7 queries    GZIP Disabled
Time is now: 15th December 2025 - 05:31 AM