 floor plan for old house

views
     
ArchId
post Oct 11 2024, 08:42 AM

Casual
***
Junior Member
344 posts

Joined: Jan 2014
From: Kuala lumpur


QUOTE(pisces88 @ Oct 10 2024, 08:24 PM)
For old landed house (double storey) in KL, where the floor plan is missing, how to proceed if want to renovate the house (including extension)?

plan is:

re-do wiring
re-do plumbing
extension
basically big reno

old developer not in business already, so unable get a copy. Whats next? Do i hire an architect to re-do the detailed floor plan and ask them to draw the new extension at the same time?

how much will it costs to draw the floor plan from scratch?
*
If you are lucky the records department will have a copy of the layout but I doubt they have it since it’s an old house … only nowadays they have a digital format copy ..

Yeap the best way is to hire architect or registered draftman to do measured drawings and incorporate the extension area for Buidling plan (BP approval )

Cost to remeasure depends on this situation
1) size of house
2) type of house ( terrace , semi-D, bunglow . Corner ? Intermediate ? End lot ?)
3) how big is the extension .. does it effect the overall house internal and external ? Or just simple carporch or just front or back extension only not effecting the internal centre of the unit space . See the complexity of your design extension .


Hope this help
Cheers mate
Izwan
Www.archidstudio.com

ArchId
post Oct 11 2024, 11:59 AM

Casual
***
Junior Member
344 posts

Joined: Jan 2014
From: Kuala lumpur


QUOTE(pisces88 @ Oct 11 2024, 10:39 AM)
thanks for the info! so draftman / architect is what i need..

its a double storey corner, extension will affect overall internal n exterior.  built up about 2000sf..  hope can find the original plan.. it will cost few thousand to re-do right?
*
Correct . Since it’s a major extension .. structure engineer is needed as well . Need to ask engineer to come and determine your existing structure and future extension area as well.
For the time being .. resolve the Buidling measured drawing first . Then easier for the engineer to study later on
Based on drawing and site condition

Cheers mate