Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Danga bay,Johor become Marina Bay,SG ?

views
     
Jazted
post Jul 26 2024, 09:47 AM

On my way
****
Junior Member
542 posts

Joined: Apr 2022
QUOTE(gnc88 @ Jul 26 2024, 09:37 AM)
MY being MY.. don't expect much. KLIA also once touted world-class.. now kat mana? Try drive around JB. The street-lamp so elaborate the design but guess what.. the lampu x nyala. That is the mentality of the people. So if you ask my honest opinion, JB will just be SG backyard playground.
*
Not much of city planning for JB. High dense apartment by developer, vehicle centric without consideration for public transport, footpath also do cincai version connecting halfway, cant even walk.
Jazted
post Jul 26 2024, 09:52 AM

On my way
****
Junior Member
542 posts

Joined: Apr 2022
QUOTE(mick84 @ Jul 26 2024, 08:12 AM)
Dulu danga bay veli the nice. Now cannot liao…
*
There should restrict the seaside can only allow shop lot. So it wont block the view, senibong cove did very well that.

Jazted
post Jul 26 2024, 09:54 AM

On my way
****
Junior Member
542 posts

Joined: Apr 2022
QUOTE(plouffle0789 @ Jul 26 2024, 09:38 AM)
user posted image
user posted image
I hope the Johor Bahru buses could be extended to run until 12 AM or 1 AM, like in Singapore. The last bus from JB Sentral to Skudai/Permas Jaya/Kangkar Pulai/Kulai/Masai/Kota Tinggi/Bukit indah /Johor Jaya  are around 10:30 PM or 11 PM.

Shenzhen has 10 MRT lines, but Johor Bahru has no Monorail or LRT systems at all.

Shenzhen have many Big MNC.

Can we become a mini Shenzhen?
How many years do we need?
*
China needs 30 years to develope shenzhen. Malaysia might need 60years or even higher due to less resources
Jazted
post Jul 26 2024, 08:44 PM

On my way
****
Junior Member
542 posts

Joined: Apr 2022
QUOTE(MGM @ Jul 26 2024, 03:33 PM)
Then move to a suitable place at least within 10km of the city centre.
May be near Kempas train station, got access to NSE, ECRL, Pasir Gudang Highway n Komuter.

user posted image
*
i think the reason WCT built township there was because it was the original BRT and the last proposal LRT route (Tun fatimah station/Johor golf station). If the move to Kempas they will missed this one.

The latest will be the elevated ART which should be concluded soon.


user posted image

This post has been edited by Jazted: Jul 26 2024, 08:45 PM
Jazted
post Jul 26 2024, 09:28 PM

On my way
****
Junior Member
542 posts

Joined: Apr 2022
QUOTE(plouffle0789 @ Jul 26 2024, 09:01 PM)
Nylex Malaysia jumps 23% in active trade on talks for LRT construction project in JB
15 Dec 2022
letter of intent (LOI)
Not LOL
Under the LOI, CRRC Changchun agrees to undertake the project as turnkey contractor and recommends the use of the straddle monorail system for the project.

On March 21, Nylex entered into a heads of agreement with

Sinar Bina Infra Sdn Bhd,

LBS Bina Group Bhd,

BTS Group Holdings Public Company Ltd
and its parent firm Ancom Nylex Bhd

, for collaboration to build and operate the LRT system in Johor Bahru.
Nylex (Malaysia) Bhd. is an investment holding company, which engages in the manufacture and marketing of vinyl-coated fabrics, calendared film and sheeting, rotomolded plastic products, and other plastic products.
The company was founded on March 26, 1970, and is headquartered in Shah Alam, Malaysia.
If gamuda bhd or IJM corp bhd better lah.........

But a plastic company.......
*
Mostly will be done by CRCC, need a local company join venture in order to bid the project. CRCC also the one supplying ART, they got multiple source of product

user posted image

 

Change to:
| Lo-Fi Version
0.0180sec    0.65    6 queries    GZIP Disabled
Time is now: 17th December 2025 - 11:38 AM