 Architect says balcony extension will affect CCC, MBSJ won't issue CCC if balcony extended

views
     
TSholynoob
post Mar 1 2024, 02:39 PM, updated 2y ago

Getting Started
**
Junior Member
94 posts

Joined: Sep 2014
Hi sifus,
I just purchased a subsale 2-storey terrace that's under MBSJ's jurisdiction. I planned to do a small front and back extension, along with a small 4ft x 4 ft extension of the balcony so it sits flush with the side wall to make the facade look more modern.

I've engaged and architect familiar with MBSJ to draw up the plan submission, everything is okay so far until the balcony part. The guy said the balcony cannot be extended even though is within MBSJ's guidelines as our previous CF was based on the current balcony, once extended will not be able to get a CCC. I'm not sure how does the previous CF affect the CCC thing works? I've honestly never heard of a CF till today but I'm assuming it's an important document based on what I read online. I asked around my neighbours and even ones that did major reno, all of them don't have it, for my side in the process to request MBSJ korek it out.

I know in my taman a lot of illegal extensions, because many not following the guidelines and over-extended. But I want to keep everything as legal as possible but still really want to just slightly extend the balcony for a more modern look, any sifus to enlighten me why this can't be done?

This post has been edited by holynoob: Mar 1 2024, 02:42 PM
mx007
post Mar 1 2024, 02:56 PM

Getting Started
**
Junior Member
153 posts

Joined: Jul 2008


I would love to comment further but im not sure what and where the balcony you are talking about

For a terrace house, you have to leave 20ft infront from boundary line there with no wall. You can extend the roof leaving maximum 10ft from boundary line to edge of roof.

For CF and CCC, basically once you renovate the house, you will get a new CCC to replace the old CF. If you have an Architect as mentioned there, he will know to apply for the new CCC upon completion. If he is a runner/just a drafter, he wouldnt know and avoid to do CCC because he does not have the qualification to do it.
fourzee
post Mar 1 2024, 03:06 PM

Casual
***
Junior Member
388 posts

Joined: Mar 2009
UBBL Clause 37. - Projection over the street and over the building line.
Item (4) - Projection above the ground floor over such building line may be permitted provided that such projection shall not exceed 1.83 metres and shall not exceed one half of the building frontage to the building line.

 