Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Renovation during Defect Period

views
     
TSrocketm
post Feb 2 2024, 06:03 AM, updated 2y ago

Regular
******
Senior Member
1,627 posts

Joined: May 2013
Hi, we will have 2 years of defect liability period after gotten the key from developer.

I would like to ask what would be the usual sequence of things below without affect the developer not responsible to any defects discover during the defect liability period for a condo/service apartment:

1. partition a small room as a store room
2. Install lights, air cond, water heater
3. Checking any water leakage to the floor below (will you do this??)
4. Checking wall (cracks, water damage, discolor), tiles (hollow sound), water blocking for all water pipes in kitchen & toilets, miscellaneous (any dent, cracks, gaps/misalignment on he doors, windows, rails, dried cement
5. Existence of the items promised by the developer
6. Moving in furniture, install curtain

Any other things I need to pay attention or check during the defect liability period? TIA.

This post has been edited by rocketm: Feb 2 2024, 06:06 AM

 

Change to:
| Lo-Fi Version
0.0149sec    0.18    6 queries    GZIP Disabled
Time is now: 3rd December 2025 - 12:32 PM