N type now is much better than P, new tech & the price of bifacial & single glass is almost the same & definitely there will be some slight improvement on production. In fact one of my friend swear he got 10% more because his roof is a flat metaldeck with light color.
Hehehe unlikely I’ll do it. But there was a study about this, however the addition of aluminium foil will only increase 1% of solar energy, not worth it
Sorry don't really get your question. My understanding is that the inverter sole purpose is to convert DC power from solar to AC. So ya, TNB power is not use at all. Maybe as a standby power for the power switch or data logger.
And yes, inverter will on and off, happens in the morning when the sun is just not bright enough, sometimes will on and off a few times before it is on fully, based on my observation.
yes, u get my question correctly, so the inverter will on and off daily, will this reduce the inverter life span? and is it normal to be installed this way?
11kwp solar panel capacity Inverter 12kw hybrid, got monitoring apps LifePO4 battery 15kwh DC earthing Manual change over single phase Testing & Commissioning
Total RM56,000
Got a quotation from a company in kuching. Monthly sesco bill myr 500 and on single phase.
By investing in this system, you will acquire savings on 99% of your monthly electricity bills. It's a tad too expensive compare to what u guys are paying
9.33 years to ROI. not worth, and sarawak using hydro power, even more green ba.
Drop the battery, I think it will reduce the price by quite alot, do not need battery currently, further down the road when battery becomes cheap then only consider.
By the way, sesco bill RM500 is about how many kwh?
QUOTE(ayamxxx @ Jul 1 2024, 10:38 AM)
this
without NEM, i don't think he can drop the battery
I believe can as what others have been doing so far, use TNB as the "battery" provider, mean total generated by solar - current supply by TNB. Correct?
1 Jul - My whole taman install new smart meter (the Solar installer say ok for install new meter) <-- already let the solar installer know on 6 Jun that my taman will have new Samrt meter installation, they say ok, go ahead let them install.
2 Jul - TNB team come and say install Smart meter for solar, but notice already change meter, they say don't need to change and leave.
3 Jul - Solar installer now say the 23 Jun application is invalid as new smart meter installed on 1 Jul, so need to submit new application. <-- now only i know the solar installer screw up the application.
Now waiting unknown when will have the smart meter update metering and power on the solar. ?? - receive NEM welcome letter from TNB. can start using the solar system (just need to flip the switch on the inverter).
Now solar installer say, nothing they can do and just can wait TNB.
Update 8 Jul, no news from TNB, no reply from solar installer since i WhatsApp them on 5 Jul. Whatsapp the installer HQ in KL, also no reply after read the message. totally silence,.
Abit confusing though, you receive the NEW welcome letter from TNB? isn't that means you can switch on?Anyway, it is just 3 July, TnB usually response in about 1 to 2 weeks, so there is still much waiting time.
1 Jul - My whole taman install new smart meter (the Solar installer say ok for install new meter) <-- already let the solar installer know on 6 Jun that my taman will have new Samrt meter installation, they say ok, go ahead let them install.
2 Jul - TNB team come and say install Smart meter for solar, but notice already change meter, they say don't need to change and leave.
3 Jul - Solar installer now say the 23 Jun application is invalid as new smart meter installed on 1 Jul, so need to submit new application. <-- now only i know the solar installer screw up the application.
9 Jul - receive email from TNB say my application is submitted for NEM and pending. 23 Jun application is cancelled. 23 Jun to 9 Jul nothing have happen , so is solar installer company wrong or TNB wrong? Who cause the 23 Jun application cancelled? Totally 17 days wasted, all solar power generated go to ground. wasted and i still keep using coal power cause of this.
Now waiting unknown when will have the smart meter update metering and power on the solar. ?? - receive NEM welcome letter from TNB. can start using the solar system (just need to flip the switch on the inverter).
Solar installer say, nothing they can do and just can wait TNB.
I have tried, only use aircond during day time, and no, my electric bill still high, been waiting for TNB to activate for 2 weeks already, they really b@bi mampus slow
what is your application status now? can see a the TNB apps.
1 Jul - My whole taman install new smart meter (the Solar installer say ok for install new meter) <-- already let the solar installer know on 6 Jun that my taman will have new Samrt meter installation, they say ok, go ahead let them install.
2 Jul - TNB team come and say install Smart meter for solar, but notice already change meter, they say don't need to change and leave.
3 Jul - Solar installer now say the 23 Jun application is invalid as new smart meter installed on 1 Jul, so need to submit new application. <-- now only i know the solar installer screw up the application.
9 Jul - receive email from TNB say my application is submitted for NEM and pending. 23 Jun application is cancelled. 23 Jun to 9 Jul nothing have happen , so is solar installer company wrong or TNB wrong? Who cause the 23 Jun application cancelled? Totally 17 days wasted, all solar power generated go to ground. wasted and i still keep using coal power cause of this.
11 Jul - receive the payment request bill RM10.
12 Jul - morning - Pending interim read at
12 Jul - 5pm - TNB guy come for meter reading again, he take picture and told me my case is in urgent case.
12 Jul - 6.30 pm - Received the Email from TNB say NEM meter complete, and a bill for this month payment.