QUOTE(WaCKy-Angel @ Aug 23 2023, 07:23 PM)
My house under renovation and extend hall 4ft front so the meter has to be moved.
Blue circle in the picture is the old "front" wall now extend 4ft out.
The green dot is the place where TNB contractor will drill to pull wiring from neighbour side to join to mine.
Please take not on the other neighbour side no drilling required because that part of wall no extension (only extend half of the wall)
TNB contractor estimated RM1800 cost to move the meter.
Anyone done before is this price justified?
Also if i want to move the meter to the outside at the porce gate pillar, is the price gonna be higher?

Please do not use other contractor aside from appointed TNB contractor otherwise they can charge you tempered with the meter , because the meter got seal with it. You can always nego the fees good luckBlue circle in the picture is the old "front" wall now extend 4ft out.
The green dot is the place where TNB contractor will drill to pull wiring from neighbour side to join to mine.
Please take not on the other neighbour side no drilling required because that part of wall no extension (only extend half of the wall)
TNB contractor estimated RM1800 cost to move the meter.
Anyone done before is this price justified?
Also if i want to move the meter to the outside at the porce gate pillar, is the price gonna be higher?