I missed out network points, it was dialup modem (1515) then! hahaha
RENOVATION REGRETS, regrets over home renovation
RENOVATION REGRETS, regrets over home renovation
|
|
Mar 7 2023, 08:16 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,845 posts Joined: Aug 2005 |
I missed out network points, it was dialup modem (1515) then! hahaha
|
|
|
|
|
|
Mar 7 2023, 09:07 PM
Show posts by this member only | IPv6 | Post
#22
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
13,786 posts Joined: Jan 2006 From: stress & confuse world |
QUOTE(WaCKy-Angel @ Mar 7 2023, 08:12 PM) U can still DIY add more lighting. yes, normally new home will have uneven wall but not noticeable if white wall without lightingJust get plaster ceiling saw, some wiring for looping and cutter to cut the metal holding plaster ceiling (if any) purpose to skim wall is if got uneven wall. u dont need to skim if its good. after painted to other color(light color) with lights on at night, the uneven wall is very obvious that i want to skim it again |
|
|
Mar 7 2023, 10:05 PM
|
![]() ![]()
Junior Member
73 posts Joined: May 2009 |
very informative
|
|
|
Mar 8 2023, 12:11 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,184 posts Joined: Jan 2008 |
Nice thread
Mine isdidn't redo the tiles for bathroom and it is slippery Should use stainless steel for grill instead of steel. Black colour kitchen top which is pain to make it clean and clear |
|
|
Mar 8 2023, 12:20 AM
|
![]() ![]()
Junior Member
295 posts Joined: Apr 2020 |
1. regret didn’t do proper roof. Developer gave shit roof and concrete roof always leaking.
2. Neighbour wall shud do up to ceiling. Now 7 ft but still need suffer the stupid neighbour put things on the wall. Look ugly. |
|
|
Mar 8 2023, 12:21 AM
|
![]() ![]()
Junior Member
295 posts Joined: Apr 2020 |
QUOTE(hihihehe @ Mar 7 2023, 09:07 PM) yes, normally new home will have uneven wall but not noticeable if white wall without lighting Happen on my previous house. Relatives come only keep say wall ugly. Haiz…after painted to other color(light color) with lights on at night, the uneven wall is very obvious that i want to skim it again |
|
|
|
|
|
Mar 8 2023, 01:06 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,952 posts Joined: Jul 2010 |
|
|
|
Mar 8 2023, 09:24 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
836 posts Joined: Aug 2007 |
QUOTE(VeeJay @ Mar 7 2023, 08:16 PM) yes, this will be part of my planQUOTE(hihihehe @ Mar 7 2023, 09:07 PM) yes, normally new home will have uneven wall but not noticeable if white wall without lighting this is quite annoying actually, especially when u look up the ceiling, it's like waves, need to force contractor to skim and smoothen it, in the case adding fluted wall also will be balanced outafter painted to other color(light color) with lights on at night, the uneven wall is very obvious that i want to skim it again QUOTE(noien @ Mar 8 2023, 12:11 AM) Nice thread i gave up on grill, go for mesh instead if got budgetMine isdidn't redo the tiles for bathroom and it is slippery Should use stainless steel for grill instead of steel. Black colour kitchen top which is pain to make it clean and clear QUOTE(Femsroot @ Mar 8 2023, 12:20 AM) 1. regret didn’t do proper roof. Developer gave shit roof and concrete roof always leaking. priority roof, piping, wiring2. Neighbour wall shud do up to ceiling. Now 7 ft but still need suffer the stupid neighbour put things on the wall. Look ugly. QUOTE(mushigen @ Mar 8 2023, 01:06 AM) What's the reason for wanting to deep clean tiles? Need to mop frequently during the initial stage after moving in? after reno complete, no matter how u mop there is still dust unsettled, deep cleaning is hiring a team of ppl to do wipedown on every inch of the house, including L box of plaster ceiling and they will clean it thoroughly, price can quite steep depending on size and height of property mushigen liked this post
|
|
|
Mar 9 2023, 12:39 AM
Show posts by this member only | IPv6 | Post
#29
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
11,667 posts Joined: Jan 2003 From: Klang/Subang |
Having no option for cement screed floor and no money to hack off ugly floor tiles
|
|
|
Mar 9 2023, 07:45 AM
Show posts by this member only | IPv6 | Post
#30
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,595 posts Joined: Sep 2021 |
1) If doing any extension of area to existing footprint - don't save on the piling. The pad footing foundation don't work, after the raining season, the newly extended area will set differently from the existing area build by the developer, the crack line on the joint between the extended wall will appear.
2) Kitchen cabinet for the sink bottom , just leave it open without any cabinet door. The area is subjected to high moisture condition, eventually the wooden cabinet will subjected to the mold growth. |
|
|
Mar 9 2023, 10:59 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
836 posts Joined: Aug 2007 |
QUOTE(nihility @ Mar 9 2023, 07:45 AM) 1) If doing any extension of area to existing footprint - don't save on the piling. The pad footing foundation don't work, after the raining season, the newly extended area will set differently from the existing area build by the developer, the crack line on the joint between the extended wall will appear. 1) demolish and re-do if possible, to prevent this joint back problem 2) Kitchen cabinet for the sink bottom , just leave it open without any cabinet door. The area is subjected to high moisture condition, eventually the wooden cabinet will subjected to the mold growth. 2) can do aluminium kitchen frame and door with tiled walls |
|
|
Mar 9 2023, 11:33 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,595 posts Joined: Sep 2021 |
QUOTE(812799 @ Mar 9 2023, 10:59 AM) 1) demolish and re-do if possible, to prevent this joint back problem Definitely need to redo but most likely when the unit is vacant because the piling work & wet work need at least 3-4 months without labor shortage issue.2) can do aluminium kitchen frame and door with tiled walls |
|
|
Mar 9 2023, 11:39 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
836 posts Joined: Aug 2007 |
QUOTE(nihility @ Mar 9 2023, 11:33 AM) Definitely need to redo but most likely when the unit is vacant because the piling work & wet work need at least 3-4 months without labor shortage issue. but you do need to apply right if it's an extension ? iinm, if extension for kitchen macam no need, but if go all the way up to 2nd or 3rd floor, need to submit drawing and get approved by local municipal, concrete cooling off period at least 9 to 12 days |
|
|
|
|
|
Mar 9 2023, 11:43 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,595 posts Joined: Sep 2021 |
QUOTE(812799 @ Mar 9 2023, 11:39 AM) but you do need to apply right if it's an extension ? iinm, if extension for kitchen macam no need, but if go all the way up to 2nd or 3rd floor, need to submit drawing and get approved by local municipal, concrete cooling off period at least 9 to 12 days Still need to apply permit for renovation even if it is single storey.If 2 storeys & above need building plan submission. |
|
|
Mar 9 2023, 11:47 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
836 posts Joined: Aug 2007 |
|
|
|
Mar 9 2023, 11:49 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,552 posts Joined: May 2010 From: In your liver |
Trusting developer's panel to handle the renovation.
Because most of the time these panel is a new company setup by their heir/relative who probably do not have much experience in this field and they chew up more than they could swallow resulting in super slow work + low quality workmanship/material used. |
|
|
Mar 9 2023, 11:53 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
836 posts Joined: Aug 2007 |
QUOTE(zero5177 @ Mar 9 2023, 11:49 AM) Trusting developer's panel to handle the renovation. imo, 2 types of contractorBecause most of the time these panel is a new company setup by their heir/relative who probably do not have much experience in this field and they chew up more than they could swallow resulting in super slow work + low quality workmanship/material used. 1) con or quit after certain % 2) con as in workmanship/material, see how much convenient to them this time i do most purchases myself, edit my own floor plan etc, time consuming but at least i know what im getting |
|
|
Mar 9 2023, 07:23 PM
|
![]() ![]() ![]()
Junior Member
426 posts Joined: Jun 2008 |
(1) Tried to cut corners when it comes to electrical and plumbing services for building a new house. Contractors subcontracted these work to people with "experiences". As a result, the water pipes burst twice, the electrical lines were broken, and the air-con piping was damaged due to hacking for rework. Now, I am concerned about the wardrobe cabinet.
(2) Neglected to verify the dimensions of the washing basins intended for the bathroom, which led to the construction of a 150mm wide box-up. Consequently, only 330mm remained for the basin area. (3) Did not carefully consider the end results wanted and have too many VOs. Initially intended to retain a portion of the old house, but later discovered that the ceiling height was inadequate for this purpose. This resulted in a waste of both time and money. |
| Change to: | 0.5508sec
0.24
5 queries
GZIP Disabled
Time is now: 8th December 2025 - 06:38 AM |