Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 single vendor vs sourcing individual vendor

views
     
heater8812
post Feb 8 2023, 09:02 PM

New Member
*
Junior Member
37 posts

Joined: Dec 2021
QUOTE(abcstop @ Feb 8 2023, 07:55 PM)
vendor management, and you can quote 30% higher for each item. If my renovation cost is RM200K, they are getting 60K as the charges for vendor management. sorry, I am not that rich; I can manage it myself. you are risking not getting anything when you have the opportunity to manage the whole renovation.
*
Then what stopping you?
What I did previously for my condo, I hired an ID firm that design the overall and supervise the construction. But I also sourced for Ikea kitchen and their installer, SPC flooring with the installer, windows and sliding door with their installer, kitchen hob/hood with their installer. Coz if issue arised later with those stuff, I can directly goes to the individual source, rather than talking to the ID firm, easier for both of us. Also, I goes for loose item/furniture and minimize carpentry works as much as possible. So mostly kinda 'plug and play'.
So my main reason to hire an ID firm is for the design, prepare measurement and the needed finishing for the other installer to work on, and to supervise all the work.

 

Change to:
| Lo-Fi Version
0.0138sec    0.33    6 queries    GZIP Disabled
Time is now: 8th December 2025 - 10:06 AM