Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Irama Villa @ Bandar Kinrara BK8

views
     
IVL
post May 24 2024, 09:32 PM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


Hi just signed SPA for Irama 4. Any owner group in Telegram? Admin do pm me
IVL
post Aug 13 2024, 05:09 AM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


QUOTE(y0un9chan @ Aug 12 2024, 11:50 PM)
user posted image

Irama villa 3&4 brochure there mentioned solar switch ready. I also saw one got Irama villa 1 unit already install solar panel at root top there.
*
Solar switch ready (one of the smart home feature) only for Irama Villa 3 and 4 --- doesn't include the Solar Panel itself


The one you saw I believe are Irama 1 and/or Irama 2 which built decade ago and owners self installed and connect


Irama 1
Irama 2


Recent Launch

Irama Villa 1
Irama Villa 2
Irama Villa 3
Irama Villa 4 (last linked in BK8)



IVL
post Aug 13 2024, 07:50 AM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


QUOTE(y0un9chan @ Aug 13 2024, 07:32 AM)
The one I saw is Irama villa 1 not Irama 1 or 2 because it still under construction. If you free you can pass by there to see. Last week I saw one unit already installed.
*
Solar Panel typically cost 20-35k depending on technology and watts.

EXCERPT from SP SETIA website:
A sustainable alternative to traditional energy sources, our homes come equipped with pre-installed wiring, allowing you to easily install solar panels whenever you desire, effectively minimising the environmental impact. Through this solar power system, sunlight is harnessed and converted into electricity, providing the energy needed to power various home appliances.


Anyway if it is true then its awesome news as i'm a purchaser of Irama V. 4

This post has been edited by IVL: Aug 13 2024, 08:07 AM
IVL
post Aug 13 2024, 07:09 PM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


QUOTE(IronManz @ Aug 13 2024, 04:44 PM)
Still feel that highway should have more than 2 lanes each way, else road congested
*
MPSJ should really just widen the road, short pain better than long pain shakehead.gif
IVL
post Aug 15 2024, 09:06 PM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


QUOTE(y0un9chan @ Aug 15 2024, 12:28 PM)
That’s why I feel Pelik. Can owner install solar panel while unit still under construction?
When I check with developer they mention so far confirmed Irama Villa have solar panel installed. They also mentioned probably all Irama Villa will have solar panel install.

Anyone check with developer on this ? 🫢
*
Developer confirmed Solar Panels inclusive for Irama Villa(s)
IVL
post Aug 16 2024, 04:11 AM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


QUOTE(y0un9chan @ Aug 15 2024, 11:21 PM)
Wow, you call and check with developer ?
*
Checked with my SA (SP staff)
IVL
post Aug 16 2024, 06:35 PM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


QUOTE(Like a Bause @ Aug 16 2024, 04:29 PM)
if it's true.. i recently just passby there also.. it was just a very small size panel only.. for a 20-30k solar panel is for quite a big size panel..  sweat.gif
*
Ok la save 10-15k - should be able to offset EV charges : whistling.gif

and save the hassles to survey to Solar provider/installer

Peace of mind is kinda priceless

This post has been edited by IVL: Aug 16 2024, 06:37 PM
IVL
post Oct 5 2024, 08:40 PM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


QUOTE(icekacangkacang @ Oct 4 2024, 10:35 PM)
I just wana buy for own stay. I went to SP showroom, all sold out....
*
Corner lot still available, 3.05mil
IVL
post Mar 24 2025, 10:35 AM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


Confirmed Irama Villa 1,2,3,4 all come with built in Solar Panel and switches rclxms.gif


Attached thumbnail(s)
Attached Image Attached Image
IVL
post Mar 25 2025, 07:24 PM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


QUOTE(bigman @ Mar 25 2025, 05:10 PM)
Legasi series until now din see any guard house... bought so mahal house, sp setia reluctant to sponsor it... unlike Sime Darby very generous to give free guard house even though the project is individual title
*
Irama Villa more exclusive in term of price point and specs.. SP Setia please la build a guard house
IVL
post Apr 24 2025, 06:15 PM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


QUOTE(mannquin @ Apr 24 2025, 05:37 PM)
Shite. Irama Villa 1 & Irama Villa 3 baru siap 70% & 30% .. Where can you get the completion progress for Irama Villa 4 yea? Was hoping to move in by end of this year
*
Few days back when I checked
Teduh KPKT shown 42% for 22*80 and 20% for 24*100

IVL
post Apr 24 2025, 06:20 PM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


QUOTE(bigman @ Apr 24 2025, 06:19 PM)
Funny… why not go to site have a look?
*
How I know him/her?

For me i’m not in Malaysia
IVL
post Apr 30 2025, 02:34 PM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


QUOTE(mannquin @ Apr 29 2025, 07:47 PM)
Yea, considering selling my units as time is of the essence. Let's skip the agent and skip the commissions. Anyone who is interested please contact me directly. The target VP date is March 2026. Lot number & price are as per below image

[attachmentid=11513076]
There is a distinct difference between 'Not in Malaysia' and 'Non-Malaysian'
*
intend to swap unit? lol just kidding. I like your end lot
IVL
post May 27 2025, 10:06 AM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


QUOTE(bigman @ May 20 2025, 08:48 AM)
the guard house only to be built after RA is formed... and is required approval from Majlis... not sure about the cost ...will be sponsored by SP Setia or not... I will ask them when getting my keys
*
What was SP Setia reply on this?
IVL
post May 27 2025, 10:12 AM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


Typical answer haiyaaa.. hows the workmanship for IV1? and whats the power output from the small solar panels ya?
IVL
post Jun 12 2025, 02:27 PM

Casual
***
Junior Member
372 posts

Joined: Nov 2012


QUOTE(bigman @ May 31 2025, 04:59 PM)
Not yet
*
Time to create one for all Irama Villas BigMan?

 

Change to:
| Lo-Fi Version
0.0219sec    0.91    7 queries    GZIP Disabled
Time is now: 12th December 2025 - 07:10 AM