Welcome Guest ( Log In | Register )

Bump Topic Topic Closed RSS Feed
3 Pages  1 2 3 >Bottom

Outline · [ Standard ] · Linear+

 Oil & Gas Careers V13 - Upstream & Downstream, 2023 is a busy year for Oil & Gas fags

views
     
contestchris
post Jan 13 2023, 12:40 PM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

What’s the latest on our local FPSO scene? Petronas outlook states up to 2 FPSO over the next 3 years, which are they referring to? Limbayong, Kelidang, Salam-Patawali? Anything else in the works?

Also, how about our FPSO operators. Any new potential wins for Yinson and Bumi Armada? Last I know is they’re both hot in Angola but so far no confirmed secured win.

I have heard they’re looking at Floating CCS…how developed and sound is such a solution?

This post has been edited by contestchris: Jan 13 2023, 12:41 PM
contestchris
post Jan 24 2023, 05:09 PM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

QUOTE(ZZMsia @ Jan 16 2023, 12:55 PM)
Bumi is waiting for the FID for Cameia.
Anyone know who is the selected contractor for Engineering?
last i heard, it wasnt awarded yet.
*
Any idea if Bumi has hired the personnel/expertise for execution?

Also, did anyone know about Claire? Was it sold or redeployed?
contestchris
post Feb 23 2023, 02:07 PM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

Petronas is preparing to launch another attempt to secure a sizeable floating production, storage and offloading vessel required for its Limbayong deep-water oilfield development offshore Sabah, East Malaysia.

The state giant recently floated market enquiries for the FPSO, kicking off its fourth effort to secure the vessel for the deep-water development project, at least two people familiar with the process told Upstream.

“Market enquiries have been issued ahead of launching a firm tender process later this year,” one person noted. A second confirmed the latest step and said that responses to fresh enquiries are due within days.

In August, the Malaysian national energy company confirmed it had aborted its third attempt at securing a leased FPSO vessel for the Limbayong development.

Industry sources said that despite having carried out three previous tenders for Limbayong, Petronas is keen to develop the offshore asset through project optimisation and by including new fields like the Bestari satellite discovery.

“We believe Bestari will be tapped along with [Limbayong], which could turn the project commercially viable this time around,” the person noted.

Other producing fields in the deep-water Sabah play could also potentially become an alternative host facility for Limbayong via subsea tie-backs, according to informed sources, Upstream previously reported.

These fields might include Shell’s Gumusut-Kakap, which is a mere 20 kilometres from Limbayong, and the Kikeh field operated by Thailand’s PTTEP, which lies within 25 kilometres.

https://www.upstreamonline.com/exclusive/ba...pso/2-1-1407108
contestchris
post Feb 23 2023, 11:34 PM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

https://www.upstreamonline.com/field-develo...ent/2-1-1408642

India’s state-controlled Oil & Natural Gas Corporation (ONGC) is aiming to begin oil production in May from its flagship KG-DWN-98/2 development in the Krishna Godavari basin, off the country’s eastern coast.

ONGC is spending more than $5 billion on developing KG-DWN-98/2’s Cluster-2 region and is “now almost ready to start oil production from May”, ONGC’s offshore director Pankaj Kumar recently said during a television interview in India.

The Cluster-2 development has been hit by multiple delays in the past two years, but Kumar noted that ONGC “continued progress on the deep-water development throughout the Covid lockdown”, which has led to a positive outcome.

Cluster-2’s floating production, storage and offloading vessel contractor, Shapoorji Pallonji Energy (SP Energy), has already confirmed that it “has achieved a significant milestone of hook-up” for the Armada Sterling V FPSO offshore Kakinada.

The floater is owned jointly, with SP Energy holding a 70% stake and Malaysia’s Bumi Armada the remaining 30%.
contestchris
post Feb 28 2023, 10:39 PM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

Guys, I have a question that perhaps members here can help answer.

We've been hearing from all over the world that the FPSO market is very tight, and that at the moment all the major players have a lot of backlog. I read SBM have 6 project backlog for FPSO. Yinson meanwhile have got 4 (just awarded another in Angola today) with another exclusive discussion, so total 5 potentially.

Where is Bumi Armada in all this? In 2015 they were working on 4 projects simultaneously, since then they only won 1 new project as a minority partner with Shapoorji.

If you see the financials, they have recovered. Is there something wrong with their management, or capability of their workforce?
contestchris
post Mar 3 2023, 10:32 AM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

QUOTE(ZZMsia @ Mar 2 2023, 08:27 AM)
Bumi is very small now compared to many years ago. And the project with SP was won a few years ago, if I'm not mistaken.
Now their project is Caema FPSO, also in Angola.

Anyone has details when is the official start?
*
Is Cameia for real though?

Looks like still far from a done deal

https://www.upstreamonline.com/exclusive/ma...pso/2-1-1407761
contestchris
post Mar 14 2023, 11:44 AM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

Guys any idea if Kelidang fpso is a real thing?
contestchris
post Mar 21 2023, 03:04 PM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

QUOTE(ZZMsia @ Mar 15 2023, 05:17 PM)
Limbayong gone...... ranting.gif  ranting.gif
*
I saw a report saying Salam Patawali FID in 2023, not sure can be trusted or not.

At the same time, for local player Bumi Armada, looking at the list of projects to be FID in 2023, their only prospect seeme to be Cameia, but apparently even that is not a done deal.

Projected FPSO/FLNG awards in 2023:

Agogo - Angola - Azule - Contracted
Cameia - Angola - TotalEnergies - Probable
Dorado - Australia - Santos - Probable
SEAP1 - Brazil - Petrobras - Probable
Pao de Acucar - Brazil - Equinor - Probable
Albacora - Brazil - Petrobras - Probable
Atapu-2 - Brazil - Petrobras - Probable
Sepia-2 - Brazil - Petrobras - Probable
Cedar FLNG - Canada - Cedar LNG - Probable
Cap Lopez FLNG - Gabon - Perenco - Contracted
Uaru - Guyana - ExxonMobil - Probable
Liza-7 - Guyana - ExxonMobil - Probable
Salam/Patawali - Malaysia - ConocoPhillips - Probable
Yakaar-Teranga - Senegal - BP - Probable
Port Delfin FLNG1 - USA - Delfin LNG - Probable

Source: CLARKSONS RESEARCH SERVICES

This post has been edited by contestchris: Mar 21 2023, 03:04 PM
contestchris
post Mar 31 2023, 03:45 PM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

Anyone knows who the buyer of Armada Claire FPSO is? Reportedly agreement has been reached.
contestchris
post Apr 4 2023, 03:13 PM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

QUOTE(ZZMsia @ Apr 3 2023, 01:29 PM)
Sap.. staff received bonus announcement last week. Between 1-2++months to be paid out in April..
*
Not June? 1.5 months
contestchris
post Apr 12 2023, 12:18 AM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

QUOTE(ask_dino @ Apr 11 2023, 11:33 PM)
Job posting for MMHE

1. Senior Executive, ICT, Planning and Risk Management
2. Assistant, Document Control
3. Designer, Structure
4. Designer, Mechanical
5. Designer, E&I
6. Designer, Piping
7. Executive, Project Cost (Finance)
8. Executive, Corporate Finance & Financial Risk Management
9. Expeditor
10. Planner (Procurement Materials)
11. Senior Executive, Naval Architectural
12. Senior Executive, Quality
13. Executive, Quality Assurance
14. Executive, Project Planning
15. Senior Executive, Electrical
16. Senior Executive, Instrumentation
17. Senior Executive, Mechanical
18. Senior Executive, Process
19. Senior Executive, Structural
20. Senior Executive, NDT
21. Executive, Structural/Architecture
22. ACAD Drafter, Instrument
23. Executive, Estimating
24. Senior Executive, Estimating
25. Executive, Project Planning
26. Executive, Comm. & Start-Up (Piping)
27. Material Coordinator
28. Supervisor, Scaffolding
29. Supervisor, Comm. & Start-Up (Piping)
30. Executive, Comm. & Start-Up (Piping)
31. Senior Executive, Mechanical & Piping
32. Executive, Mechanical & Piping
33. Executive, Electrical
34. ACAD Drafter, Structural/Architecture
35. Supervisor, Piping

Work location will be based in Pasir Gudang, Johor. Forward your profile to hr@mmhe.com.my and please indicate position applied for a quick respond.
Good luck!
*
A lot of hiring to come, they're focusing on international bids now

This post has been edited by contestchris: Apr 12 2023, 12:24 AM
contestchris
post May 4 2023, 12:01 PM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

QUOTE(ZZMsia @ May 3 2023, 06:45 PM)
Bumi armada graduate program has closed.
On BP, I am not aware but their pay scale is very generous for seniors
*
Bumi Armada hiring but they're stripping the company off. Sold off Armada Claire. Disposed all but one OSV. The Mumbai FSRU has been scrapped. Still no new FPSO contract since many years, plus the latest new per UpstreamOnline is that Total is considering other options for Cameia FPSO in Angola.

Looks like financially they okay now, but what's their core business going forward? Pivot to green energy? Still nothing to show for though.

This post has been edited by contestchris: May 4 2023, 12:02 PM
contestchris
post May 23 2023, 09:20 AM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

Guys, what’s going on at Petronas? They scrapped Limbayong FPSO 3 times but now hitting the market with Bestari tender for a far smaller FPSO (15k bopd).

Anyone know any further information on it.
contestchris
post Jun 13 2023, 04:54 PM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

It seems like the project execution team is ready at Bumi Armada side. What's the hold up for Cameia now? Should've been sanctioned by now, no? Possibility for TotalEnergies to change their mind (despite the Conditional LOA)?
contestchris
post Jun 30 2023, 10:56 AM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

QUOTE(ZZMsia @ Jun 28 2023, 11:58 AM)
Worley - Many engineers and designers being recruited and at the same time - among the existing that are leaving due to overworked.

Technip - Many engineers resigned to go overseas, join Saipem or join Qatar (NOC / QP / QG).

RNZ - Recruiting for current projects

DAR - Recruiting for current, upcoming projects and also existing employees resigned to join other companies (Including Worley) 

Aker- Recruiting

Mcdermott KL- Recruiting for several departments (Process).
*
Any information on the floaters side? Bumi, Yinson, Misc, Shapoorji
contestchris
post Jun 30 2023, 11:30 AM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

I know Shapoorji was hiring for quite a number of roles for their new FPSO project in KL and Singapore a couple months back. Not sure what project though, as the Sterling V is nearly gonna hit first oil.

Anyone have more information on their project?
contestchris
post Aug 5 2023, 01:17 AM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

TotalEnergies starts fresh talks with FPSO players on delayed $6 billion Africa project

The French supermajor in 2021 launched a preliminary front end engineering and design (pre-FEED) competition for a 100,000 barrels per day FPSO, then aiming to take the final investment decision the following year.

However, a number of factors including the Covid pandemic, supply chain costs, contractor financing constraints and production sharing contract negotiations with Luanda conspired to delay the project.

The offshore development is now expected to be sanctioned this year and is scheduled to come on stream in 2026.

Participants in the original paid pre-FEED contest were Technip Energies of France working with Malaysia’s Yinson; Italy's Saipem working with MISC of Malaysia; and Kuala Lumpur-based Bumi Armada.

At the end of that design contest, Bumi Armada emerged as the preferred FPSO supplier, well-placed sources said, and subsequently the Malaysian player worked on the project's FEED phase, which would have evolved into a turnkey contract.

However, multiple sources have told Upstream in recent months that Bumi Armada has pulled out of further contract talks for reasons that are unclear.

TotalEnergies is now sourcing a replacement supplier for what is said to be a 70,000-bpd FPSO, with the name of Saipem — which participated in the original design contest — cropping up a lot on the market grapevine, alongside some Asian names; while Modec and BW Offshore might also consider throwing their hat into the ring, Upstream understands.

According to sources close to the project, the floater will not be chartered, but will instead be provided on an engineering procurement, construction and installation basis, with TotalEnergies set to own the vessel outright.

https://www.upstreamonline.com/exclusive/to...ect/2-1-1495756

How come? I thought someone replied about this that the project team was already in place in Bumi Armada.

This post has been edited by contestchris: Aug 5 2023, 01:18 AM
contestchris
post Aug 5 2023, 12:24 PM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

QUOTE(ZZMsia @ Aug 5 2023, 09:51 AM)
Bumi is definitely out as mentioned by myself few weeks ago. It was shared with me from a top Bumi guy and I cannot share what is the reason behind.
What is unclear is if bumi has any other main prospect..
*
As I can tell, no main project. FSRU in Mumbai (JV with Shapoorji) is the closest, official award still at least 6 months away. There is development of Floating Carbon Injection vessel, conceptual stage. Official award if any still a year away.

I do wonder what the reason for the pull out is, since from what I know, considerable resources had been allocated to the Cameia project.
contestchris
post Aug 30 2023, 01:54 PM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

Any idea which FPSO Bumi team working on? I see they have quite a sizeable engineering team but not any known project at the moment (since it was confirmed they are no longer bidding for Cameia FPSO).
contestchris
post Sep 22 2023, 04:05 PM

Look at all my stars!!
*******
Senior Member
5,531 posts

Joined: Aug 2011

Anybody know about the Pertamina-Bumi Armada FLNG project in Indonesia?

3 Pages  1 2 3 >Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.0336sec    0.51    7 queries    GZIP Disabled
Time is now: 3rd December 2025 - 09:55 AM