Heard the punch list for this Kasawari phase 1 CPP is a nightmare haha good luck to carry over the work at offshore Bintulu.
Oil & Gas Careers V13 - Upstream & Downstream, 2023 is a busy year for Oil & Gas fags
Oil & Gas Careers V13 - Upstream & Downstream, 2023 is a busy year for Oil & Gas fags
|
|
Aug 10 2023, 10:06 AM
Show posts by this member only | IPv6 | Post
#361
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,351 posts Joined: Oct 2009 From: Bintulu, Sarawak |
Heard the punch list for this Kasawari phase 1 CPP is a nightmare haha good luck to carry over the work at offshore Bintulu. xiaoxiaoshen liked this post
|
|
|
|
|
|
Aug 10 2023, 12:08 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,491 posts Joined: Jan 2013 |
|
|
|
Aug 10 2023, 01:54 PM
Show posts by this member only | IPv6 | Post
#363
|
![]() ![]() ![]()
Junior Member
475 posts Joined: Dec 2011 |
|
|
|
Aug 10 2023, 03:12 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,491 posts Joined: Jan 2013 |
|
|
|
Aug 10 2023, 06:43 PM
|
![]() ![]() ![]()
Junior Member
475 posts Joined: Dec 2011 |
QUOTE(ZZMsia @ Aug 10 2023, 03:12 PM) Hancur la like that... Kena late penalty lagi.. I have not seen fabricators able to take up installation and commissioning scope yet. This would be the first.If they manage to pull it off, I'm sure other operators would be more than willing to let fabricators do the job than in house. |
|
|
Aug 10 2023, 06:51 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,491 posts Joined: Jan 2013 |
QUOTE(yunodie @ Aug 10 2023, 06:43 PM) Hancur la like that... Kena late penalty lagi.. I have not seen fabricators able to take up installation and commissioning scope yet. This would be the first. Most of the EPCIC it is part of the fabricator / EPCIC contractor scope. MMHE has no T&I and has no commissioning assets. All outsourced, but risk is sitting with them / Technip MMHE JV as the main contractor. If they manage to pull it off, I'm sure other operators would be more than willing to let fabricators do the job than in house. |
|
|
|
|
|
Aug 10 2023, 07:28 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,491 posts Joined: Jan 2013 |
The T&I is split into 2 subcons - Heerema and also Sapura.
There's few scopes, including floatover, jacket lifting, pipelines, WHP's. The overall contract is very extensive and the platform has grown in size (around 10% weight) from proposal stage. |
|
|
Aug 11 2023, 11:33 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,553 posts Joined: May 2009 |
these punch list half baked items is going to run down the budget when operations starts. to top it off once audits starts going in all kind of non sense can be found from process safety, integrity , reliability safety etc. which then itself will result in more run down of the budget for rectifying things rectified making for an endless loop of rectification. This post has been edited by mhyug: Aug 11 2023, 11:34 PM mohdyakup liked this post
|
|
|
Aug 13 2023, 05:48 AM
Show posts by this member only | IPv6 | Post
#369
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
QUOTE(mhyug @ Aug 11 2023, 11:33 PM) these punch list half baked items is going to run down the budget when operations starts. to top it off once audits starts going in all kind of non sense can be found from process safety, integrity , reliability safety etc. Those are the challenges and complications of commissioning a multi billion offshore plant.which then itself will result in more run down of the budget for rectifying things rectified making for an endless loop of rectification. mohdyakup liked this post
|
|
|
Aug 13 2023, 05:53 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,491 posts Joined: Jan 2013 |
QUOTE(mhyug @ Aug 11 2023, 11:33 PM) these punch list half baked items is going to run down the budget when operations starts. to top it off once audits starts going in all kind of non sense can be found from process safety, integrity , reliability safety etc. Yeah, that is why I am not sure which CPP / major platform EPCIC in Malaysia yielded a lot of profit or any profit at all.which then itself will result in more run down of the budget for rectifying things rectified making for an endless loop of rectification. One I know is SKNC3 CPP |
|
|
Aug 15 2023, 07:15 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,491 posts Joined: Jan 2013 |
The floatover for Kasawari will be performed tomorrow mohdyakup liked this post
|
|
|
Aug 16 2023, 12:44 PM
Show posts by this member only | IPv6 | Post
#372
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
QUOTE(ZZMsia @ Aug 15 2023, 07:15 AM) The Chinese navy must be watching the platform installation too. |
|
|
Aug 16 2023, 10:50 PM
Show posts by this member only | IPv6 | Post
#373
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
https://www.freemalaysiatoday.com/category/...second-quarter/
MHB lost money in 2nd quarter 2023 This post has been edited by Stamp: Aug 16 2023, 10:51 PM |
|
|
|
|
|
Aug 17 2023, 07:30 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,491 posts Joined: Jan 2013 |
QUOTE(Stamp @ Aug 16 2023, 10:50 PM) Yes - lost lots of money (Provision and non-provision).Mostly from Kasawari.... Phase 1 CPP mohdyakup liked this post
|
|
|
Aug 17 2023, 05:02 PM
Show posts by this member only | IPv6 | Post
#375
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,491 posts Joined: Jan 2013 |
Float over was a success. Next up is the bridge installation. mohdyakup liked this post
|
|
|
Aug 18 2023, 12:33 AM
Show posts by this member only | IPv6 | Post
#376
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
QUOTE(ZZMsia @ Aug 17 2023, 07:30 AM) Heard they were slapped with a hefty VO from the T&I contractor. mohdyakup liked this post
|
|
|
Aug 18 2023, 12:35 AM
Show posts by this member only | IPv6 | Post
#377
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,864 posts Joined: Nov 2008 |
QUOTE(ZZMsia @ Aug 17 2023, 05:02 PM) That’s a great achievement! Congrats to the naval archs, all of them locals, to engineer the heaviest topside floatover mating in Malaysia history! |
|
|
Aug 19 2023, 04:15 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
4,351 posts Joined: Oct 2009 From: Bintulu, Sarawak |
Transocean Deploys World's First Subsea 20,000 psi Blowout Preventer
August 17, 2023 Offshore drilling contractor Transocean said Wednesday that the world’s first subsea 20,000 psi blowout preventer (BOP) had been successfully deployed from its Deepwater Titan drillship. https://www.oedigital.com/news/507294-video...owout-preventer |
|
|
Aug 20 2023, 07:56 PM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,922 posts Joined: Apr 2009 From: Constellation Cygnus |
QUOTE(Stamp @ Aug 18 2023, 12:33 AM) T&I done by heerema? mohdyakup liked this post
|
|
|
Aug 21 2023, 07:04 PM
Show posts by this member only | IPv6 | Post
#380
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,491 posts Joined: Jan 2013 |
|
|
Topic ClosedOptions
|