QUOTE(ongss @ Aug 1 2022, 10:29 PM)
For those light points, the conduits are in the RC slab. The conduits were installed when the construction workers build the mould for the RC slab. The electricians missed out the conduits for the power and network. The conduits on the floors were done by his subcontractors (mainly foreign labour that can speak Bahasa or English).
Why conduit inside RC slab...
Aug 2 2022, 11:45 AM

Quote
0.0216sec
0.57
7 queries
GZIP Disabled